- Charity commission for england and wales General Aptitude Interview Questions
- Charity commission for england and wales Trainee Interview Questions
- Charity commission for england and wales Personal Questions round Interview Questions
- Charity commission for england and wales HR Interview Questions
- Charity commission for england and wales Lead Interview Questions
madras
1/6
I solve it as the 280m train being stationary… and the 120m train moving at (42+30) = 72kph…. or 20mps
The front of the train will have to go 280m to pass the stationary train plus another 120m for the backs to clear… that is 400m in all.
The time to travel 400m at 20mps is 20secs
The formula to find number of diagonals (D) given total number of vertices or sides (N) is
N * (N – 3)
D = ———–
2
Using the formula, we get
1325 * 2 = N * (N – 3)
N2 – 3N – 2650 = 0
Solving the quadratic equation, we get N = 53 or -50
It is obvious that answer is 53 as number of vertices can not be negative.
Alternatively, you can derive the formula as triange has 0 diagonals, quadrangel has 2, pentagon has 5, hexagon has 9 and so on……
Hence the series is 0, 0, 0, 2, 5, 9, 14, …….. (as diagram with 1,2 or 3 vertices will have 0 diagonals).
Using the series one can arrive to the formula given above.
124
C-2896
It’s choice A because you take the last to letters and move them to the front then the previous two letters go after them and so on.
b)Brother or Sister
Because Bis related to either Brother or Sister.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
10, 14, 28, 32, 64, 68, 132
132
mr, blue was compplete the contract in 12 days