A 1×1 cube in the middle of an edge of the 3×3 cube will
have two faces painted. A cube has 12 edges, so the answer
is 12.
Take one fruit from box with label mixture. If we see
orange, because the basket lies (it cant have a mixture),
then it has only oranges. The other 2 are labeled apples and
oranges. The one labeled apples,
cannot have oranges inside, cos they are allready been
identified, and because it lies, it cannot have apples either.
So it has a mixture. And we are left with the one labeled
oranges that lies and has apples.
Artificial silk
He will work for 35 days in 60 days to earn Rs.170 as per the condition
a printer produced 176400 lines in 420 minutes
it produces 176400/420 lines per minute = 420
answer is : 420 lines per minutes
GERMANY
Country Name..
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
163
$57.30
1*2=2
2*2=4
2*4=8
8*4=32
Ans : 32
15%
60 liter