Yellow Red Green
Blue Blue Green
Yellow Green Yellow
The Answer is 3
p = prob(1st digit not 7)*prob(2nd digit not 7)*prob(3rd
digit not 7)
=(8/9)*(9/10)*(9/10)
=0.72
Sandhya had it right except that there are 900 numbers
between 100 and 999 inclusive (not 899).
Reliable Assistance: I promise to provide reliable and accurate assistance in answering questions, providing information, and engaging in meaningful conversations. I strive to deliver helpful and relevant responses to the best of my abilities, drawing from the vast knowledge and information I have been trained on.
Continuous Improvement: I promise to continuously improve my capabilities and expand my knowledge base. As technology evolves and new information becomes available, I aim to stay up-to-date and provide the most accurate and relevant information possible. I strive to enhance my understanding of different topics and improve the quality of my responses over time.
Respectful and Ethical Interaction: I promise to interact with users in a respectful and ethical manner. I am programmed to respect user privacy, confidentiality, and cultural sensitivities, aiming to provide a positive and helpful experience for those who engage with me.
Please note that while I can provide valuable assistance and information, there are certain tasks that may be better suited for human professionals with expertise in specific fields.
1200 meter
(c) 25%
20*55*65=y*65*75
y=(20*55*65)/(65*75)
y=14.667 =15
y=15
% reduction=(20-15)/20=25%
60%
In this question only one data is given ie., hole length - 6". In the question there is no mistake.
Find the answer.
volume of a sphere is 4/3 * pi * r^3
by drilling a hole 6 inches long the volume of the sphere is
not affected bcos the hole is a 1 dimension quantity..(say a
straight line) n so it does not have any value w.r.t volume…
hence the volume of the sphere does not change..
1st gets 15 RS less than average
4x+60=s
x=(s-60)/4 = s/4-15
s/4 is average
1st gets 15 RS less than average
Tree
i will put my sincere effort in my work for upward growth
of my career as well as my company.
12
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Let length of tunnel is x meter
Distance = 800+x meter
Time = 1 minute = 60 seconds
Speed = 78 km/hr = 78*5/18 m/s = 65/3 m/s
Distance = Speed*Time
=>800+x=653∗60=>800+x=20∗65=1300=>x=1300−800=500
72