GIVEN: 2A(B+C)+AC-2C(A-B)
THEREFORE 2AB+2AC+AC-2AC+2BC
2AB+AC+2BC
2(AB+BC)+AC
LET b1=AB b2=BC b3=AC
STEP1: b1 = b1+b2
so b1 = AB+BC
THEREFORE
NOW: b1 = AB+BC b2 = BC b3 = AC
STEP 2: b3 = b1+b3
so b3 = AB+BC+AC
THEREFORE
NOW: b1 = AB+BC b2 = BC b3 = AB+BC+AC
STEP3:
NOW: b1 = b1+b3
so b1 = AB+BC+AB+BC+AC
=2(AB+BC)+ AC
AB BC AC
STEP1 AB+BC BC AC
STEP2 AC BC AB+BC+AC
STEP3 AB+BC+AB+BC+AC BC AB+BC+AC
i.e 2(AB+BC)+AC BC AB+BC+AC
8:20
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
The queen gave two rings to two daughter’s and she kept the
third ring in her jewel box and she presented the ring to
her third daughter along with that jewel box.
c
Therefore, the number of possible 13 digit numbers using 1, 2, 3, 4, 5 which are divisible by 4
= x 3 + x 2
= (3 + 2)
=
= 244140625 ways
(3/4)*(L/Sp)=30
L/Sq=75
(3/4)*(Sq/Sp)=30/75
Sq/Sp=8/15
Sp/Sq=15/8
48,400
A rude person who doesn’t respect me
1
30
1.5 km/hour