CPNCBZ
Let’s assume the length of each train is ‘L’ and the speeds of the two trains are ‘V₁’ and ‘V₂’ respectively.
When the trains are moving in the opposite direction, their relative speed is the sum of their individual speeds. The total distance they need to cover is the sum of their lengths. Since they cross each other completely in 5 seconds, we can set up the following equation:
(V₁ + V₂) × 5 = 2L
When the trains are moving in the same direction, their relative speed is the difference between their individual speeds. The total distance they need to cover is the difference between their lengths. Since they cross each other completely in 15 seconds, we can set up the following equation:
(V₁ – V₂) × 15 = 2L
Now, let’s solve these equations to find the ratio of their speeds.
From the first equation, we have:
(V₁ + V₂) × 5 = 2L
V₁ + V₂ = (2L) / 5
From the second equation, we have:
(V₁ – V₂) × 15 = 2L
V₁ – V₂ = (2L) / 15
Let’s add these two equations together:
V₁ + V₂ + V₁ – V₂ = (2L) / 5 + (2L) / 15
2V₁ = (6L + 2L) / 15
2V₁ = (8L) / 15
V₁ = (4L) / 15
So, the speed of the first train is (4L) / 15.
Now, let’s substitute this value back into the first equation to find V₂:
(4L) / 15 + V₂ = (2L) / 5
V₂ = (2L) / 5 – (4L) / 15
V₂ = (6L – 4L) / 15
V₂ = (2L) / 15
Therefore, the speed of the second train is (2L) / 15.
The ratio of their speeds is given by:
(V₁ / V₂) = ((4L) / 15) / ((2L) / 15)
(V₁ / V₂) = 4L / 2L
(V₁ / V₂) = 2
So, the ratio of their speeds is 2:1.
My definition of success is being able to complete the task given to me in the provided timeline
let t = total no of students.. then
students who passed one or both subjects,
n(e U h) = n(e) + n(h) – n(e intersection h)
=> t = 0.8t + 0.7t – 144
=> t = 1.5t – 144
students who failed both subjects is 10% i.e. 0.1t
=>t-n(e U h) = 0.1t,
=>t -(1.5t – 144) = 0.1t
=>t- 1.5t- 0.1t = -144
=> -0.6t = -144
=>t = 240
Ravi do a work in 30 days
Prakash do a work in 40days
then both work together 1/30+1/40=70/1200
then solve values 120/7 is 17(1/7) days
2years
Let the total number of matches to played in the tournament be ‘x’.
Given that A county cricket team has won 10 matches and lost 4.
That means total number of matches played = 14.
So,
= > 70% of x = 14
= > (70/100) * x = 14
= > 70x = 1400
= > x = 20.
So, the number of matches to be played = 20.
They have a record of exactly 75% wins = 20 * 75/100
= > 15.
Therefore, the number of matches should the team win = 15 – 10 = 5.
Hope this helps!
35 is not the factor of 120 so…35 is the answer
10m
30+2=32
A 1×1 cube in the middle of an edge of the 3×3 cube will
have two faces painted. A cube has 12 edges, so the answer
is 12.