Gain=(profit/c.p)*100
Gain =selling price-cost price =900-675
=225.
Gain=(225/675)*100.
=33.3%
A rude person who doesn’t respect me
If a blue stone is thrown into a red sea, several things could happen depending on the context and the properties of the stone and the sea:
Symbolically: Since blue and red are contrasting colors, the interaction of a blue stone in a red sea could be seen as a visual or metaphorical contrast. It could represent a stark difference or an unexpected element introduced into an existing situation.
Scientifically: In reality, the color of the stone and the sea would not have a direct physical impact on each other. The stone would sink or float based on its density and the water’s buoyancy. The color of the water, whether red or any other color, does not change the fundamental principles of objects interacting with liquids.
It’s important to note that red seas, in the context of bodies of water, typically do not exist naturally. The phrase “red sea” is often used metaphorically or symbolically rather than referring to an actual body of water with a red color.
800 yards
Prob(choosing two people who are a couple from 6 couples) = 1/6
We have 5 couple left (10 people)
Prob(choosing a person A from 10 people) = 1/10
Prob(choosing 1 person who is not a couple of A) = 1/8
Prob(choosing 4 people that has exactly one couple) = 1/6*1/8*1/10 = 0.0021
acno is right answer
7 : 3
385, 462, 572, 396, 427, 671, 264
427 is the answer
Because
385 means (3+5=8) or (8-3=5) ,
462 means (4+2=6) or (6-2=4) ,
572 means (5+2=7) or (7-5=2) ,
396 means (6+3=9) or (9-3=6) ,
671 means (6+1=7) or (7-6=1) ,
264 means (4+2=6) or (6-2=4) ,
but only 427 is the number in which if we do addition of any of its two digits (e.g 4+2 or 4+7) then its answer doesn’t come 3rd digit
like if we do 4+2 then answer will be 6 so the number should be 426 but it is not
or if we do 7-4 then answer will be 3 (not 2)
so the right answer is 427
Grandfather
The work done by A in 8 days is = 8/ 12 = 2/3
Means A alone completes 2/3 part of work.
Remaining work which is (1–2/3) = 1/3 is completed by B in 8–2 = 6 days
So the complete work done by B in 6/(1/3) = 18 days.
B alone can complete the work in 18 days.
8+1=9
9+2=11
11+3=14
14+4=18
18+5=23
and finally
23+6=29
$20
6, 13, 18, 25, 30, 37, 40
40
b
( c ) 10