10%=394;50%=1970;250%=9850;30%=1182;
250%+30%=9850+1182=11032
3×8=24=2xt ===> t=12hours
7/5 * 5/q = 7/10
35/5q = 7/10
q=10
125% of s = 60
=> 1.25s = 60
=> s = 60*4/5
=> s = 48
60 – s = 60 – 48 = 12
Answer is 16
1,2,4,7,11,….
1+(1) =2
2+(2) =4
4+(3) =7
7+(4) =11
Therefore
11+(5) =16
LET ACTUAL PRICE BE 100 RS(FOR CONVINIENCE)
THEREFORE IF PRICE IS CUT BY 20%
THEREFORE NEW PRICE=100-20=80 RS
THEREFORE WE NEED TO ADD X% TO 80 RS TO MAKE IT 20 RS AND ADD IT TO 80 TO MAKE IT 100RS
THEREFORE, 80X/100 = 20
I.E. 4X/5=20
THEREFORE x=20*5/4
=5*5
=25
HENCE 25% OF PRICE SHOULD BE ADDED TO MAKE THE PRICE EQUAL TO THE ACTUAL PRICE.
2, 6, 12, 20, 30, 42, 56, (…..)
Difference between 2 and 6 is = 4
Difference between 6 and 12 is = 6
Difference between 12 and 20 is = 8
Difference between 20 and 30 is = 10
Difference between 30 and 42 is = 12
Difference between 42 and 56 is = 14
So ne number will be with 16 Difference i .e 72
Therefore Answer will be 72
56.25%
Servlets are faster as compared to JSP, as they have a short response time.
JSP is slower than Servlets – JSP is a HTML-based codes.
Servlets are harder to code, as here, the HTML codes are written in Java – JSPs are easier to code, as here Java is coded in HTML.
In an MVC architecture, Servlets act as the controllers. – In MVC architectures, the JSPs act as a view to present the output to the users.
The service() function can be overridden in Servlets. – The service() function cannot be overridden in JSPs.
Since the total train length passed the tunnel so the distance would be the length of train added to the tunnel legth
D=150+300=450 mt.
speed = distance/time
speed = 450/(40.5/3600)
speed =40,000 mt/sec
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
15%