let x=speed
t=time taken when speed is x so…
xt=4/5x(t+40)
t=160 minutes
2 hr 40 minutes
Solution # 15-18
Sitting solution be- D T M B H R
Ans 15 :Mr. D
ans 16 : 1 2 3
Ans 17 : 3
Ans 18 : Mr B Suffering from anemia.
1(1/7)hr
Train speed 90 km /h
1st we have to change in m/s. then 90*5/18=25m/s
Then d=speed*time
=25*10=250m train length
A control using ActiveX technologies. An ActiveX control
can be automatically downloaded and executed by a Web
browser. ActiveX is not a programming language, but rather
a set of rules for how applications should share
information. Programmers can develop ActiveX controls in a
variety of languages, including C, C++, Visual Basic, and
Java.
21
As it is a right angled triangle so we know the hypotenuse must be 13 and 5 & 13 are base and height (in any order).
Area of triangle = 0.5* base * height = 0.5 * 5 * 12 = 30
MEDICINE will become EOJDJEFM in the same code.
13
167
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
(a) 29.12 (actual)
first year rate of paper (inflation rate) : 25 + 25 *
6.5/100 = 26.625
paper rate in first year is 1.5 % more . ..thr4
inflated cost in 1 yr = 26.625 + 1.5 / 100 * 26.625 =
27.024.
second year : 27.024 + 27.024 * 6.5 / 100 = 28.78
paper cost : 1.5 /100 * 28.78 + 28.78 = 29.12 ( approx..)
ans=13.33
solution: (710/12)*8 – 460