Let n be the number of days it takes A and B, working together, to finish. And we know B=A+10 and B=3A, so:
3A=A+10
2A=10
A=5
Then B=15
So:
1/A + 1/B=1/n where n is the total amount of days. So:
1/5 + 1/15=1/n
3n+n=15
n=15/4 days
Average = (1+2+3+4+5+6+7+8+9)/3
= 45/3 = 15
Every side will contain sum of 15.
1st side contains 8 and 7.
2nd side contains 9 and 6.
3rd side contains 1,2,3,4 and 5.
32000
23
From the first statement
Speed=distance/time
=>240/24=10m/s
so speed=10m/s
From the second statement
distance=length of the platform+length of the train=650+240=890m
Time=distance/speed
here, the speed of the train is already calculated
=>890/10=89s
So the time taken by the train to cross the platform is 89 seconds
let the for digit number be = pqrs
p=q/3 ==>q = 3p
r=p+q=p+3p =4p
s=3q = 3(3P)=9p
number:
p 3p 4p 9p
let p=1 answer is 1349
if it 2 answer 2 6 8 18
so it becomes five digit number so correct answer is 1349
A
as total 16 floors out of them 11 were rented to A and B company .So remaining floors are 5 and each floor is 12000s.ft
So remaining = 12000*5
=60000
X filling rate is 1/18 or 4/72 per hour
Y filling rate is 1/24 or 3/72 per hour
Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence
72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72
So at 20.5 hours with X turn filling is 100% complete with 72/72
Answer: It will take 20.5 hours to completely fill this tank.
Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share
the answer is At 9:48 PM
At 1:00 pm the difference between A & B = 8 km
after 2:00 pm ………………. = 11 km (as B’s speed
is 1 and A’s 4 km, then eqv speed=(4-1)=3 km)
After 3:00………………….. = 13 km (as B’s speed 2 km)
After 4:00………………….. = 14 km
after 5:00………………….. = 14 km (A’s speed= B’s
speed)
after 6:00………………….. = 13 km
after 7:00………………….. = 11 km
after 8:00………………….. = 8 km
after 9:00………………….. = 4 km
and now the eqv speed is= (9-4) =5 km/hr;
and the renaming distance is 4 km;
then, time=(60*4)/5=48 min;
then the meeting time is=9:00+48 min=9:48 pm;
Green bricks
419