1.75-1.68=0.07
“Since I’ve been working and gaining experience to get into this company, I’d like to stay a long time if I’m offered the job, since this is where I want to be. “ “As long as there’s a lot of work to do, then I’d be happy to stay for a long time. Since I’m a busybody, I like to being productive most of the time.”
ans: A/2
u get a diamond shape when u join those mid points
consider the 4 unshaded triangles
and u can form 2 square
when u analyse the squares u will get the answer
Initially, potatoes have 99% water by weight ; which means they have 1% solid non-water content.
1% of 100 kg = 1 kg
Now even when they dehydrate,this 1kg solid mass remains constant.
It is given that finally, 98% is water by weight , which implies that 2% is non-water solid.
This means 2% of total weight = 1 kg
Total weight *2/100 = 1 kg
Therefore, total weight finally = 50 kg.
Let us consider previous salary as a ‘X’ then
0.12*X=0.10*(X+1200)
0.02X=120
X=120/.02=6000
X=6000
His previous salaray was 6000
40
40
30
60
– 10 cows
+ 20 days
if 40 cows can eat for forty days
then 20 cows can eat for 80 days
Mm
Accounting and Finance
length is 30 breadth is 12 and height is 12
——————————
1
.——————————
1 .
1 .
1 10 .
1
1 .
1
1
1 30 .
——————————-.
1
consider right angled triangle
so the distance= square root of (30*30+10*10)
I’m gonna chill in the bay area, who would want to drive up till the ocean?
190, 166, 145, 128, 112, 100, 91
128 is incorrect. There is a difference of multiples of 3 in the number pattern, which starts at 24 and reduces by 3 each time. Therefore the correct pattern would read 190, 166, 145, 127, 112, 100, 91.
this would leave the pattern with differences in the pattern 24, 21, 18, 15, 12, 9. The next number in the pattern would be 6 lower than 91. 91 – 6 = 85. Then 85 -3 – 82, followed by 82 – 0 = 82. After this, if -3 were taken the pattern would start to rise so 82 – – 3 = 85.
The work done by A in 8 days is = 8/ 12 = 2/3
Means A alone completes 2/3 part of work.
Remaining work which is (1–2/3) = 1/3 is completed by B in 8–2 = 6 days
So the complete work done by B in 6/(1/3) = 18 days.
B alone can complete the work in 18 days.