Ques:- X, Y and Z can do a piece of work in 24, 30 and 40 days respectively. They start the work together but Z leaves 4 days before the completion of the work. In how many days is the work done?
Ques:- Time management means planning
Ques:- A person starts from his house and walks 2km straight and then takes a right turn and walks for 1km and again takes a right turn and walk for another 1km. now if he is in north – west direction from his house; find out the direction in which he has started from the house?
Recent Answer :
: West
Ques:- What do you expect from the company if you get hired?
Ques:- Sanjeev ranks seventh from the top and twenty eight from the bottom in a class. How many students are there in the class?
Recent Answer :
: the answer is 34
Ques:- Are you comfortable for working 6 days?
Ques:- How amny times u met ur P.M?(In P.M)
Ques:- What might make you leave this job?
Ques:- A bundle of balloons contains 12 packets and there are 24 bundles in a box. The retail price of a packet of balloons is given by the user and calculate the price of such 5 boxes.
Ques:- cost of an item is Rs 12.60 7 profit is 10% over selling price what is the selling price
Recent Answer :
: Rs.13.8677
Ques:- When you will be back to india?
Ques:- Why 20-20 cricket is more famous?
Ques:- The area of a square field 3136 sq m, if the length of cost of drawing barbed wire 3 m around the field at the rate of Rs.1.50 per meter. Two gates of 1 m width each are to be left for entrance. What is the total cost?
Ques:- In a class of 65 students and 4 teachers, each student got sweets that are 20% of the total number of students and each teacher got sweets that are 40% of the total number of students. How many sweets are there?
A. 104
B. 845
C. 897
D. 949
Recent Answer :
: D
Ques:- What has been your proudest professional achievement till now?
Ques:- How will you measure height of building when you are at the top of the building? And if you have stone with you.
Ques:- The numbers 1, 3, 5, ….., 25 are multiplied together. The number of zeros at the right end of the product is
A. Four
B. Three
C. Two
D. Zero
Recent Answer :
: 0
Ques:- How do you go about making an important decision affecting your career?
Ques:- Hans is standing behind Gerrie and at the same time Gerrie is standing behind Hans. How is this possible
Ques:- Examination passed from and either training was done or not?
Ques:- There are 4 identical tabulates 2 for fever and 2 for cough,you have to take 1 tabulate of fever and 1 tabulate ofcough, if you consume 2 same type of tabulates you will die.then how to consume tabulates???
Recent Answer :
: we need to take half tabulate among the 4 tablets. den it ll be like 1 tabulate is of fever and one tabulate is of cough
Ques:- When will you join?
Ques:- What are your stregth
Ques:- The true discount on Rs. 2562 due 4 months hence is Rs. 122. What is the rate percent?
Ques:- An individual pays 30% income tax. On this tax he has to pay a surcharge of 10%. Thus the net tax rate, he has to pay is
A. 27%
B. 33%
C. 40%
D. 45%
Recent Answer :
: b
Ques:- The radius of a cylindrical vessel is 7cm and height is 3cm. Find the whole surface of the cylinder?
Recent Answer :
: 2* pi* r ( h + r )
r=3cm
h=7cm
2 * 22/7 *7 ( 10 ) = 440 sq cm
Ques:- What was your work in your last company?
Ques:- Sum of two numbers is 80. Greater number exceeds by 5 from four times of the smaller. Find the numbers?
Recent Answer :
: Let x and y be the two numbers. And x > y.
Then,
x + y = 80—–(1)
y=80-y
Also,
x = 4y – 5
Solving the two equations,
80 – y = 4y – 5
85 = 5y
Therefore, y = 17
put the value of y in equation(1)
then
x+y=80
x+17=80
x=63
the numbers are 17&63
Ques:- Why are you looking for a change?
Ques:- A train 100 meters long completely crosses a 300 meters long bridge in 45 seconds. What is the speed of the train is?
Recent Answer :
: 32 Km/hr
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.