- Universal paper and plastics General Aptitude Interview Questions
- Universal paper and plastics Trainee Interview Questions
- Universal paper and plastics Personal Questions round Interview Questions
- Universal paper and plastics HR Interview Questions
- Universal paper and plastics Lead Interview Questions
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Let us consider previous salary as a ‘X’ then
0.12*X=0.10*(X+1200)
0.02X=120
X=120/.02=6000
X=6000
His previous salaray was 6000
360 years old
Nepo’s son age = x
Nepo’s age = 3x
Nepo’s father age = 2*3x + 40
x + 3x + 6x + 40 = 1240
10x = 1200
x = 120
Nepos age = 3* 120 = 360 years
Capacity of the tank =(12 x 13.5) liters =162 liters.
Capacity of each bucket =9 liters
Number of buckets needed = 162/9 =18.
9828
Camel is the answer
Camel can store water for many days or months in there intestines
1km is equal to 1000 meter
Therefore 225 meter is how many km
Then we have to cross multiply
1km – 1000 meter
? – 225 meter
0.225 km
Then we have to apply formula
Speed = Distance/Time
Speed = 0.225/12 sec
= 0.01875×3600sec
= 67.5
Therefore speed of train is = 67.5
It’s choice A because you take the last to letters and move them to the front then the previous two letters go after them and so on.
789, 645, 545, 481, 440, 429, 425
b
we consider a round shape cake.then cut in 2 equal parts in cut into center and next you have to cut its side by center then you have to get 8 equal parts in 3 exact cut
divide 100 by 7, and you get 14.28. (Obviously you aren’t talking about decimals here) and so 14 numbers can be divisible by 7 up to 100.
The answer is 14.
% error= (new no-actual no)/actual no *100
% error= [(x/7)-7x]/7x * 100
% error= 48x/49x * 100
% error= 0.9795*100=97.95
80
1) time =20mins,speed=15kmph=15*(5/18)=25/6 m/sec
distance=20*(25/6)=250/3 m
then 2) given as time =15min
speed=250/3*15=(50/9)*(18/5)kmph=20kmph
By 1hour both trains meet, so the distance travel by fly in
1hr is 120km.