Mixture is 1.2 L of A + 2.4L of B which is 3.6L total. 1.2L / 3.6L = 1/3 (0.33)
16.25
Time =9 seconds
Speed =(60×518) m/sec=(503)m/sec
∴ Speed =DistanceTime
Length of the train (Distance) = (Speed × Time) = (503×9) m=150 m.
Answer:
24
Step-by-step explanation:
A + B = 40.
And at Rs 7 a kg for 40 kg, you want a total of Rs.280.
So the second equation is 9A + 4B = 280
From the first equation: B = 40 – A
and sub into the second equation:
9A + 4(40-A) = 280
9A + 160 – 4A = 280
5A = 120
A = 24.
And you should check: B should equal 40-24 = 16. Check with the final equation: 9*24 + 4*16 = 216 + 64 = 280. So it works.
Your answer, of course, is A = 24
740
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
2, 6, 12, 72, 824
2
6*2=12
12*6=72
72*12=864
Answer: C
Explanation:
900 — 100
100 — ? => 100/900*100 => 11.11%
AB
15, 16, 34, 105, 424, 2124, 12576
The series is 15, 16, 34, 105, 424, 2124, 12576
1) (15*1) + 1 = 16
2) (16*1) + 2 = 34
3) (34*3) + 3 = 105
4) (105*4) + 4 = 424
5) (424*5) + 5 = 2125
Clearly, they gave 2124 instead of 2125, so it is the wrong number in the series.
40
40
30
60
– 10 cows
+ 20 days
if 40 cows can eat for forty days
then 20 cows can eat for 80 days
4
6 cuts
( a ) BQDCJCMF
“TERMINAL” split it into the half we get “TERM” “INAL”
Now the first half is decreased by one and the next half is
increased by one, so we get:
“SDQLJOBM” (pls note in the ques we have “SDQIJOBM” where
‘L’ shud have come instead of ‘I’)
so “CREDIBLE” is to “BQDCJCMF”
Simple interest Formula:
A=P(1+rt)
Therefore,
815=P(1+3r)
P+3r=815
854=P(1+4r)
P+4r=854
Solve the sums using Elimination method.
P+4r=854
P+3r=815
r=39.
Toget Principal
P+4r=854
P+4*39=854
P=854-117
P=698
11
if it is for MIcrosoft Interview Question, I sure they will
give you the job if you answer, “Google it”.
c