sister
4/9
we know,
area=b*h
b gets increased by 20% i.e (b+0.20b)
h gets decreased by 20% i.e (h-0.20h)
rewriting the equation(area=b*h),
area=(b+0.20b)*(h-0.20h)
area=b(1+0.20)*h(1-0.20)
area=b(1.20)*h(0.80)
area=b*h*(1.20)*(0.80)
area=b*h*(0.96)
i.e new area=0.96 times the original area
if 100% was the original area,it has decreased to 96%
so,100%-96%= 4%
ans is a
d
1. 1g
2. 3g with 1g counter
3. 3g
4. 3g plus 1g
5. 3g plus 1 g plus 1g weighed medicine
6. 9g with 3g counter
7. 9g with 1g of counter and 1g weighed medicine
8. 9g with 1g counter
9. 9g
10. 9g plus 1g
11. 9g plus 3g with 1g on counter
12. 9g plus 3g
13. All 3 weights on one side.
The numbers that lie between 100 and 1000 which are divisible by 14 are 112, 126,140 …,994
a = 112; l = 994, d = 14
n= (l−a)/d+1
= (994-112)/14+1
= 64
Sn=n/2(l+a)
= 64/2(994+112)
= 32*1106
= 35392
Use 3pt. Formula
( (x-x1)/(x2-x1) )=( (y-y1)/(y2-y1) )
We get 150
find out what is the problem and taking the bad out always works.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
a printer produced 176400 lines in 420 minutes
it produces 176400/420 lines per minute = 420
answer is : 420 lines per minutes