Since the total train length passed the tunnel so the distance would be the length of train added to the tunnel legth
D=150+300=450 mt.
speed = distance/time
speed = 450/(40.5/3600)
speed =40,000 mt/sec
1, 3, 10, 21, 64, 129, 356, 777
a
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
I believe it will be 30 km/hr
Ans. let x is distance from A to B
and y is initial speed.
30/y+(x-30)5/4y -x/y = 3/4
=> 4x-12y=120 —-(1).
45/y + (x-45)5/4y -x/y=3/5
=> 5x-12y=225 ——-(2).
From equ (1) and equ (2) we will get.
x=25 and y=105
so initial speed is 25 km/hr
and Distance From A to B is 105 km
Very exited
200/3
answer : 36 –Explaination:
X= Chickens
Y = Qty per day
X*Y*9= 12 *.9 *Y*30
x=36
4:3
A—–>B (first train)
B——>A(second train)
A/B=Srureroot((time to B)/(time to A))
11
68 is the least number when divided by 8, 12, 18 and 24 leaves the remainders 4, 8, 14 and 20
p = prob(1st digit not 7)*prob(2nd digit not 7)*prob(3rd
digit not 7)
=(8/9)*(9/10)*(9/10)
=0.72
Sandhya had it right except that there are 900 numbers
between 100 and 999 inclusive (not 899).
125
as i assume the time taken to complete the job is not to be
changed while increasing the employees as it does not
clearly states so……….
30 men wrk for 9 hrs
therefore for the work to be done if no of workers is
increases the no of hrs / day to work should decrease so
here s a inverse relation
solving further we get
30 = K /9 ==> K= 270
now
40 = 270/y ==> y= 6.75
therefore ans is d)none
2^a = 2 x 2+a
a^3= 2 x a + 3
=> 4+a= 2a + 3
=> a = 1