Ques:- What’s your dream job?
Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Ques:- TELL ABOUT YOUSELF?
Ques:- How you came to know about this company?
Ques:- What’s one thing in your life you would have done differently if you could do it over again?
Ques:- How prepare our resume?
Ques:- How did spent your yesterday?
Ques:- For cascaded 1800 BTS with master 900 BTS,if 900 master BTS is down for its own equipment fault,cascaded slave 1800 BTS gets down/stop carrying traffic without any fault as BCCH and other controllong channels are in master 900 BTS.Is there any technology/
Recent Answer : Added by DK BOSS On 2021-07-30 16:26:20:

Might be using dual E1 in that case will be much more helpful.

Ques:- How to make operation smooth?
Ques:- Use three adjectives to describe yourself?
Ques:- Navin walked 20 metres towards the East took a left turn and walked 10 metres and again took a left turn and walked 20metres. How far is he from his starting position?
A. 10 metres
B. 50 metres
C. 40 metres
D. 30 metres
E. None of these
Recent Answer : Added by Admin On 2020-05-17 12:03:42:

( a ) 10 metres

Ques:- If selected how many years you will continue to work with the company
Ques:- One TR = ?kacl/hourOne US Gallon = ?liters
Ques:- Why do u select to do MBA in HR after doing B.Sc in physics?
Ques:- What r u left ur curently job?
Ques:- During a trip to a wildlife safari, 29 tourists clicked photographs of tigers, 21 clicked photos of elephants, 26
clicked photos of deer; 14 clicked photos of elephants and deer, 12 clicked photos of tigers and elephants, 15 clicked photos of deer and tigers, and 8 clicked photos of all the three animals. Each tourist took at least one photograph.

1. How many tourists went to the wildlife safari?

2. How many tourists clicked photographs of tigers only?
Recent Answer : Added by mohammed suhail On 2022-03-09 16:39:25:

1. 43 venn diagram
2. 10 using venn diagram

done it roughly chances of having wrong are their..thank u.

Ques:- Draw three concentric circles with a line passing through their centers without lifting your hand.
Ques:- your aim is to become engineer then why join mba.
Ques:- A>B, B>C, C=D, D>E, then which is greatest
Recent Answer : Added by Admin On 2020-05-17 12:00:05:

Example 1:
Assign, A=20, B=10, C=5, D=5(Because C is equal to D as
given), E=1.
A/B = 20/10 = 2. So A/B = 2
A/C = 20/5 = 4. So A/C = 4
A/E = 20/1 = 20. So A/E = 20
Therefore “A/E is Greatest”
Example 2:
Assign, A=100, B=50, C=20, D=20(Because C is equal to D as
given), E=10.
A/B = 100/50 = 2. So A/B = 2
A/C = 100/20 = 5. So A/C = 5
A/E = 100/10 = 10. So A/E = 10
Therefore “A/E is Greatest”

Ques:- A tank is filled in 5 hours by three pipes X, Y and Z. The pipe Z is twice as fast as Y and Y is twice as fast as X. How much time will pipe X alone take to fill the tank?
Recent Answer : Added by sahana u k On 2022-04-02 07:00:59:

35 hours

Ques:- How many days stay at Mundra?
Ques:- One side of a rectangular field is 4 m and its length along diagonal is 5 m. What is the area of the field?
Recent Answer : Added by Aditya D On 2022-09-21 16:49:44:

area is given by Area of Rectangle = Length of Rectangle*(sqrt((Diagonal of Rectangle^2)-(Length of Rectangle^2)))
so substituting we get area=4*(sqrt((25-16)))
area=4*(sqrt(9))
since area cannot be negative hence we take sqrt of 9 as 3 (as sqrt of 9 is 3 and -3 as well)
area=4*3=12m^2

Ques:- Technical Interview
Ques:- How prepare for Group discussion topics?help me giving some GD topics and answers for that?
Ques:- If A/B = 3/5,then 15A = ?
Recent Answer : Added by Sandeep On 2021-07-31 16:36:01:

15a=45

Ques:- Ramesh can finish a work in 20 days and Sushil in 25 days. They both work together for 5 days and then Sushil goes away. In how many days will Ramesh complete the remaining work?
Recent Answer : Added by DK BOSS On 2021-07-17 10:05:29:

Answer:
11 days.

Step-by-step explanation:
In the question,

Time taken by Ramesh to finish a piece of work = 20 days

Time taken by Sushil to finish a work = 25 days

Time for which they worked together = 5 days

Sushil left after = 5 days

So,

One day work of Ramesh is,

One day work of Sushil is,

So,

Work done in 5 days is given by,

Therefore, Remaining work is given by,

Now, as the Sushil left the remaining work was done by Ramesh,

Time taken by Ramesh for the remaining work is,

Therefore, the remaining work will be completed in 11 days by Ramesh.

Ques:- Joe started from Bombay towards Pune and her friend julie in opposite direction. they met at a point . distance traveled by joe was 1.8 miles more than that of julie.after spending some both started there way. joe reaches in 2 hours while julie in 3.5 hours.Assuming both were traveling with constant speed. What is the distance between the two cities.
Ques:- How does one use DES securely ?
Ques:- Kamal started a business investing Rs. 9000. After five months, Sameer joined with a capital of Rs. 8000. If at the end of the year, they earn a profit of Rs. 6970, then what will be the share of Sameer in the profit?
A. Rs. 1883.78
B. Rs. 2380
C. Rs. 3690
D. Rs. 3864
Recent Answer : Added by sujata On 2022-08-24 17:03:55:

2380

Ques:- what does success mean to you?

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top