sow
Now as per question, Kamal invested for 12 months and Sameer invested for 7 months.
So, Kamal:Sameer=(9000×12):(8000×7)
=108.56=27:14
Sameer ratio in profit will be =6970×4114=Rs.2380
cant say
If c is 5 times faster than a then he can do it in 2 days alone.
15km/hr
Let the number of males be given the name M.
Let the number of females be given the name F.
If 15 females are absent, then M will be twice that of
present females.
This means that M = 2 * (F – 15)
M = 2 * F – 30.
or 2 * F – M = 30.
Now if in addition to the 15 females being absent, we also
have 45 males being absent,
then this gives the equation,
(F – 15) = 5 * (M – 45)
which simplifies to
F – 15 = 5 * M – 225
5 * M – F = 210
Pulling the equations together, we get
5 * M – F = 210
-M + 2 * F = 30
Multiply the first equation by 2, and keep the second
equation as is.
10 * M – 2 * F = 420
– M + 2 * F = 30
Add the equations.
9 * M = 450
M = 50
Verify answer.
Calculate F
from – M + 2 * F = 30
-50 + 2 * F = 30
2 * F = 30 + 50
F = 40.
If 15 females are absent, then number of males will be twice
that of females.
40 – 15 = 25.
50 = 2 * 25. Confirmed.
If also 45 males were absent, then female strength would be
5 times that of males.
Female strength is 25 due to the 15 females being absent.
50 – 45 = 5.
25 = 5 * 5. Confirmed.
2, 4, 12, 48, 240, (…..)
C)1440
2*2=4
4*3=12
12*4=48
48*5=240
240*6=1440
Let A=5x,B=3x,C not given so consider C=x
In triangle total angle=180°
A+B+C=180°
5x+3x+x=180°
9x=180°
X=180°/9
X=20°
A=5(20)=100°
B=3(20)=60°
C=20°
Therefore A=100° is the largest angle
Ans: 100°
Explanation:
72 — 9
? —- 1
=> Down Stream = 8
45 —- 9
? —- 1
=> Up Stream = 5
Speed od current S = ?
S = (8 – 5)/2 = 1.5 kmph.
Total number of pairs is NC2^{N}C_2NC2. Number of pairs standing next to each other = N. Therefore, number of pairs in question = NC2^{N}C_2NC2 – N = 28/2 = 14. If N = 7,
7C2 – 7 = 21 – 7 = 14….
N =7
Three man’s on day work = 1/6+1/7+1/8=73/168
three man’s can complete the work in 1/73/168 days
= 168/73 days
Now if they works together fro the alternet days they will
complete the worksin 2*168/73 days
(If three mans working for the alternate days then work
completion time will be doubbled)
8400 ? 120 x 15 + 150 = ?
ans:
8400 % 120 x 15 + 150 = ?
1200
I think it’s 32 not 37