c
65292
Total distance to cover = 132 +110 = 242m
Speed = 72kn/hr = 20m/s
time = 242/20 = 12.1 sec.
D
451 times.
Explanation: There are 60 minutes in an hour.
In ¾ of an hour there are (60 * ¾) minutes = 45 minutes.
In ¾ of an hour there are (60 * 45) seconds = 2700 seconds.
Light flashed for every 6 seconds.
In 2700 seconds 2700/6 = 450 times.
The count start after the first flash, the light will
flashes 451 times in ¾ of an hour.
s1(1+x/100)+s2(1+x/100)+s3(1+x/100)
c=a/b
c=a-1
=>b=a/c
=>b=a/a-1
D
name
7 : 3
the answer is At 9:48 PM
At 1:00 pm the difference between A & B = 8 km
after 2:00 pm ………………. = 11 km (as B’s speed
is 1 and A’s 4 km, then eqv speed=(4-1)=3 km)
After 3:00………………….. = 13 km (as B’s speed 2 km)
After 4:00………………….. = 14 km
after 5:00………………….. = 14 km (A’s speed= B’s
speed)
after 6:00………………….. = 13 km
after 7:00………………….. = 11 km
after 8:00………………….. = 8 km
after 9:00………………….. = 4 km
and now the eqv speed is= (9-4) =5 km/hr;
and the renaming distance is 4 km;
then, time=(60*4)/5=48 min;
then the meeting time is=9:00+48 min=9:48 pm;
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
5 litre jug contains 4 litres of salt water solution
with 15% of salt, that means it has 4000*.15 = 600 ml salt
in it.
If 1.5 litres solution is spills out, remaining solution
is 2.5 litres, then the salf content is 2500*.15 = 375ml.
Now, the jug is filled to full capacity with water i.e.,
now the jug has 5 litre solution in it.
Now, the salt content is 375/5000 = 7.5%
1600 years contain 0 odd day.
300 years contain 1 odd day.
94 years = (23 leap years + 71 ordinary years)
= (46 + 71) odd days
= 117 odd days, i.e., 5 odd days
Days from 1st January 1995 to 28th February 1995
= (31 + 28) days = 59 days
= (8 weeks + 3 days) = 3 odd days
∴ Total number of odd days
= (0 + 1 + 5 + 3) = 9 odd days i.e., 2 odd days.
So, the required day is Tuesday.
15/46
My standard for success is to build confidence, be able to earn money, and meet people.
I will reading IPad questions and Awsome
the qs here is talking about 50 states in USA.So if u remove
one from 50, which one would it be is the qs!!!
u should answer as either u would remove the state with
lowest population or state with less natural resources or
some thing else..
6+8+10+10= 36
6²+8²+10²+12²=344