8, 13, 21, 32, 47, 63, 83
X filling rate is 1/18 or 4/72 per hour
Y filling rate is 1/24 or 3/72 per hour
Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence
72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72
So at 20.5 hours with X turn filling is 100% complete with 72/72
Answer: It will take 20.5 hours to completely fill this tank.
Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share
163
1 1 2+4
2 2 1+4
3 1+2 4
4 4 1+2
5 4+1 2
6 4+2 1
7 4+2+1 0
1×2×…100=100!
Number of zeros in product of n numbers =[5n]+[52n]+[53n]+…
Number of zeros in product of 100 numbers =[5100]+[52100]+[53100]
where [.] is greatest integer function
=[20]+[4]+[0.8]=20+4=24
ans 810 i think
240 m
Tree
Both simultaneously because sales is the revenue generation team which is necessary for the commercial growth of the company whereas customer loyalty is again important for a company to go for long-term growth which is why good and satisfactory customer experience is necessary.
Let’s assume the length of each train is ‘L’ and the speeds of the two trains are ‘V₁’ and ‘V₂’ respectively.
When the trains are moving in the opposite direction, their relative speed is the sum of their individual speeds. The total distance they need to cover is the sum of their lengths. Since they cross each other completely in 5 seconds, we can set up the following equation:
(V₁ + V₂) × 5 = 2L
When the trains are moving in the same direction, their relative speed is the difference between their individual speeds. The total distance they need to cover is the difference between their lengths. Since they cross each other completely in 15 seconds, we can set up the following equation:
(V₁ – V₂) × 15 = 2L
Now, let’s solve these equations to find the ratio of their speeds.
From the first equation, we have:
(V₁ + V₂) × 5 = 2L
V₁ + V₂ = (2L) / 5
From the second equation, we have:
(V₁ – V₂) × 15 = 2L
V₁ – V₂ = (2L) / 15
Let’s add these two equations together:
V₁ + V₂ + V₁ – V₂ = (2L) / 5 + (2L) / 15
2V₁ = (6L + 2L) / 15
2V₁ = (8L) / 15
V₁ = (4L) / 15
So, the speed of the first train is (4L) / 15.
Now, let’s substitute this value back into the first equation to find V₂:
(4L) / 15 + V₂ = (2L) / 5
V₂ = (2L) / 5 – (4L) / 15
V₂ = (6L – 4L) / 15
V₂ = (2L) / 15
Therefore, the speed of the second train is (2L) / 15.
The ratio of their speeds is given by:
(V₁ / V₂) = ((4L) / 15) / ((2L) / 15)
(V₁ / V₂) = 4L / 2L
(V₁ / V₂) = 2
So, the ratio of their speeds is 2:1.
47 is answer by consecutive adding of
8+5=13
13+8=21
21+11=32
32+14=46
46+17=63