To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
324:400:576?
18×18:20×20:24×24:26×26
324:400:576:676
31.6%
100-20%=80
80-10%=72
72-5%=68.4
100-68.4= 31.6%
7days
1:2:3 or 1:2:4
5:6::7:10::6:5
=((5/6)/(7/10)/(6/5))
=((5/6)*(6/5)/(7/10))
=(1/(7/10))
=10/7
It is assumed to be constant. Now, to cross past the pole, the train should cover a distance of x meters. Now, the time taken by the train to cross a platform of length 100 m is 25 seconds. Hence, the length of the train is 150 m.
cant say
If c is 5 times faster than a then he can do it in 2 days alone.
1 through 24, divisible by 2 in descending order.
That leaves you with:
24, 22, 20, 18, 16, 14, 12, 10, 8, 6, 4, 2
8th place FROM the bottom means your answer will be 16.
i will put my sincere effort in my work for upward growth
of my career as well as my company.