Joe is fencing in a square area of 576 square feet.
Fence posts, which are needed every three feet, cost 32.00 each.
The fencing cost 4.50 per foot. What is the total cost of the fencing materials?
Solution:-
Area of Square is 576 sq ft.
so, the length of side = root(576) = 24 ft
Since the fencing would be done on the perimeter, we would need that
formula is 4*side = 96 ft.
Number of Fence post needed = 96/3 = 32
1 Fence post cost = 32
32 Fence Post cost = 32 * 32 = 1024
Fencing cost = Perimeter * fencing cost = 96 * 4.5 = 432
Total Cost = 432 + 1024 = 1456
50
2years
yea may be they are brothers only by father or by mother
2hr 24min
we know,
area=b*h
b gets increased by 20% i.e (b+0.20b)
h gets decreased by 20% i.e (h-0.20h)
rewriting the equation(area=b*h),
area=(b+0.20b)*(h-0.20h)
area=b(1+0.20)*h(1-0.20)
area=b(1.20)*h(0.80)
area=b*h*(1.20)*(0.80)
area=b*h*(0.96)
i.e new area=0.96 times the original area
if 100% was the original area,it has decreased to 96%
so,100%-96%= 4%
1/24+1/30+1/40=1/10 => 10 days
4/10 = 0.4
1/(24*0.4)+1/(30*0.4) = 0.1875 => 5.33
(10-4) + 5.33 = 11.3 days
Options:
A) EDRIRL
B) DCQHQK
C) ESJFME
D) DEQJQM
Ans: A)
Quick
9, 11, 15, 23, 39, ?
71
( C ) Crawl
156
125
My standard for success is to build confidence, be able to earn money, and meet people.
let d distance and s be speed.
d/7 = x and d/5 = x+12
solving we get d=210.
Calculation:
⇒ If 1000 divided by 112, the remainder is 104. ⇒ 112 – 104 = 8 ⇒ If 8 is added to 1000 it will become the smallest four-digit number and a multiple of 112. ⇒ 1000 + 8 = 1008 ∴ The required result will be 1008.
C