835, 734, 642, 751, 853, 981, 532
835,sum(digits)= 16
734 = 14
642=12
751= 13,
853=16,
981=18,
532=10
answer(c)751
Given:
Principle Amount(P):₹5000
S.I:₹16500
Rate of Interest(R):15%
Find:T
SI=P*T*R/100
T=SI*100/P*R
T=16500*100/5000*15
T=22 YEARS
The first 10 odd prime numbers are 3, 5, 7, 11, 13, 17, 19, 23, 29 and 31.
Sum of the odd prime numbers = (3+5+7+11+13+17+19+23+29+31)
= 158
Number of odd prime numbers = 10
We know, Average = (sum of the 10 odd prime numbers ÷ Number of odd
prime numbers)
Average =
= 15.8
∴ The Average of first 10 prime numbers which are odd is 15.8
– While the train is moving, the jogger will also be running in the same direction.
– for the head(engine) of the train to get to the current position of the jogger 240m away, it will take:
45km/hr => 12.5m/s => 240/12.5 = 19.2 seconds.
– But in the same period of time, the jogger will still be running and will have moved to a new location by: 9km/hr => 2.5m/s => 2.5 * 19.2 = 48m
To get to the new location at the speed of 12.5m/s will take the train:
48/12.5 = 3.84sec
In this additional time, the jogger will move forward by:
3.84 * 2.5 = 9.6m
at a speed of 12.5m/s, it will take the train less than a second to cover the additional 9.6m
If we add the distance the jogger will cover in 1 second to 9.6, it is still less than what the train can cover per second. let us see (9.6 + 2.5 = 12.1)
Therefore, the head of the train will pass the runner at approximately: 19.2 + 3.84 + 1 => 24.04 seconds.
For the train to completely pass the runner, it will need its whole length of 120m to be in front of the runner.
This will take an additional (9.6 + 2) seconds.
Therefore for the length of the train to be ahead of the runner it will take approx. 35.65 (24.04 + 9.6 + 2) seconds
D = 180m
S = 42 – 6 = 36 * 5/18 = 10
T = D/S = 180/10
T = 18s
say the work is w and let no of days taken by b is ‘x’ which
we have to calculate
so work done by a in one day is w/6
work done by b in one day is w/x
a and b together can do work in 4 days ie=(w/6)+(w/x)=(w/4)
solving equation x=12
so no of days taken by b=12
Here is the ans with explanation…..
Just divide 48 hours into 8 parts…
for flowchart its 1/4 so it is 2/8 = 12hours
For Coding it is 3/8 = 18 hours
the rest is again 3/8 = 18 hours for debugging..
d
HCF= 2
LCM = 2*5*7 = 70
20
D
X+x+2+x+3=42
3x+6=42
3x=42-6=36
X=12
X+2=14
X+3=15
Middle number 14
C will take 4 days and the total number of days taken by a,b and c will be 12 days.
No loss no gain.
A parabola is a conic section.
So cut a cone obliquely.
tan 30=h/x
tan 15=h/100+x
so h/tan 30=(h/tan 15)-100
=33.33app
Let ‘N’ is the smallest number which divided by 13 and 16 leaves respective remainders of 2 and 5.
Required number = (LCM of 13 and 16) – (common difference of divisors and remainders)
= (208) – (11) = 197.