Spade 13/52 = 1/4
King 4/52 = 1/13
Spade OR King 13/52 + 4/52 – 1/52 (because the King of Spades is in both groups) = 16/52 = 4/13
( e ) Apple
answer is 100
[(45 men*8hours)/30 meters]=12 (working rate)
[(x men*5 hours)/50 meters]=12 (working rate is same)
then x=100
( c ) R or T
Answer: 50 kmph.
Explanation:
Let the distances between city A to B and B to C be 2x km and 3x km respectively.
Total time taken to cover from A to C
= (2x)/40 + (3x)/60 = (6x + 6x)/120 = 12x/120 = x/10 Average speed = (2x + 3x)/(x/10) = 50 kmph.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
decrease two times
6561 → 6560/2 [-1]
3280
1640
820
410
205 [+1] =206
103 → [-1] = 102
51 [+1] = 52
26
13 [-1] = 12
6
3 [+1] 4
2
1
A parabola is a conic section.
So cut a cone obliquely.
area is doubled.
actual area = 1/2 bh
after increase area = 1/2 *4b* h /2
=bh
1/2 *bh *2 = bh
therefore area is doubled
Ravi do a work in 30 days
Prakash do a work in 40days
then both work together 1/30+1/40=70/1200
then solve values 120/7 is 17(1/7) days
1,50,000