Mohammad Gauri
24000
This is a sequence of English letters, in numbers.
⇒ ten = 3 letters
⇒ nine = 4 letters
⇒ sixty = 5 letters
⇒ ninety = 6 letters
⇒ seventy = 7 letters
⇒ Sixty six =8 letters
⭕️This logical question goes with the no. of letters in the number!!!!!!!
⭕️∴ the biggest number with 9 letters will be ninety-six (96).
390
The answer is A)
y1 = 62 Rs/kg
y2 = 72 Rs/kg
y = 64.5 Rs/kg
y2 – y1 = 10 Rs/kg
The distance between the y and y1 is
y – y1 = 64.5 – 62 = 2.5
x1 = (y – y1)/(y2 – y1) = 2.5/10 = 0.25
x2 = 1 – x1 = 1 – 0.25 = 0.75
The target price is calculated by the lever method.
x1 * y2 + x2 * y1 = 0.25 * 72 + 0.75 * 62.5 = 64.5
The ratio is of y1 to y2 is
0.75 : 0.25
Divide by both by 0.25
3 : 1
No of men employed = N
No of days to finish the work = 9 days
No of men after increase = (N + 10)
No of days to finish the work = 6 days
Equating mandays
9N = (N+10)*6
9N — 6N = 60
3N = 60
N = 20
No of men employed = 20
E non of those
Answer:50.24
Explanation:
Area of a circle =π*r*r
616=π*r*r
r*r= 616÷3.14
r*r =196
r =13
Circumference of a circle= 2*π*r
=2*π*13
=16*3.14=50.24
A perfect square is a square number of a digit. eg 64 is a perfect number, a square of 8
Now digits AB9 is a square number of a number.
AB9 Can also be written as A multiply by B multiply by 9
Get the Square root of AB9
Assumption, A=1, B=1
1*1=1=A, 1*1=1=B Therefore,
Square root of A = A, B = B and 9=3
Therefore
An odd number is a number indivisible by 2.
for example 1,3,5,7…….
Therefore Squares A*B*9= AB9
Where a=1, b=1, 3 as digits.
Conclusion
A=1 is an odd number
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
A
Gain=(profit/c.p)*100
Gain =selling price-cost price =900-675
=225.
Gain=(225/675)*100.
=33.3%
1min = 60 seconds
6 min=6*60=360seconds
4 sec=10
360sec=360*10 /4=900
35000