C)3
when know that 13 is factor of 39 so it will also not be able to divide it differently. so the remainder will be same 20 but as we know that 20 is greater then 13 so we can divide it once again and in the casE of 13 the remainder will be 20-13=7
16
1+1=2
2+2=4
3+4-7
4+7=11
5+11=16
let first digit be ‘X’
then 5th digit is ‘3X’
let 2nd digit be ‘Y’
then 3rd digit is ‘Y-3’
and 4th digit is ‘Y+4’
then the no is ‘(X)(Y)(Y-3)(Y+4)(3X)’
from the above we can say 3X<=9
so X<=3 and any of the digit in the number is <=9
and also given that 3 pairs sum is 11...
so make trial and error..
if X=1...any of the no is 10 which is wrong trial....
if X=2...then let Y+4=9 ==> Y=5
then no is 25296
first pair 2+9=11
second pair 2+9=11
third pair 5+6=11
now the answer is 25296
if A is true B has to be true
each pencil 100/25 = 4
each book 100/15 = 6.66
100 – 15 = 85
85-5*4 = 65
65/6.66 = 9
he can buy 9 books that is not in given options currently so
answer is NONE
Joe is fencing in a square area of 576 square feet.
Fence posts, which are needed every three feet, cost 32.00 each.
The fencing cost 4.50 per foot. What is the total cost of the fencing materials?
Solution:-
Area of Square is 576 sq ft.
so, the length of side = root(576) = 24 ft
Since the fencing would be done on the perimeter, we would need that
formula is 4*side = 96 ft.
Number of Fence post needed = 96/3 = 32
1 Fence post cost = 32
32 Fence Post cost = 32 * 32 = 1024
Fencing cost = Perimeter * fencing cost = 96 * 4.5 = 432
Total Cost = 432 + 1024 = 1456
225
12
512
X filling rate is 1/18 or 4/72 per hour
Y filling rate is 1/24 or 3/72 per hour
Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence
72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72
So at 20.5 hours with X turn filling is 100% complete with 72/72
Answer: It will take 20.5 hours to completely fill this tank.
Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share
120
i will drop a mail saying that can you pleaae meal me the the originals of the stregic plan
A control using ActiveX technologies. An ActiveX control
can be automatically downloaded and executed by a Web
browser. ActiveX is not a programming language, but rather
a set of rules for how applications should share
information. Programmers can develop ActiveX controls in a
variety of languages, including C, C++, Visual Basic, and
Java.
5 + 6 + 7 + 8 + 9 = 35 so two primes 5 and 7.