17 secs
the answer is At 9:48 PM
At 1:00 pm the difference between A & B = 8 km
after 2:00 pm ………………. = 11 km (as B’s speed
is 1 and A’s 4 km, then eqv speed=(4-1)=3 km)
After 3:00………………….. = 13 km (as B’s speed 2 km)
After 4:00………………….. = 14 km
after 5:00………………….. = 14 km (A’s speed= B’s
speed)
after 6:00………………….. = 13 km
after 7:00………………….. = 11 km
after 8:00………………….. = 8 km
after 9:00………………….. = 4 km
and now the eqv speed is= (9-4) =5 km/hr;
and the renaming distance is 4 km;
then, time=(60*4)/5=48 min;
then the meeting time is=9:00+48 min=9:48 pm;
Speed = 13+4 km/hr
Distance = 68 km/hr
Time=distance/speed
68/17=4hrs
Relative velocity of trains = 49kmph -25 kmph = 24kmph
=6.67m/s
Time taken to cross the first train = 10 sec
Length of the second train = Relative Velocity * Time taken
to cross the first Train = 6.67 *10 = 66.7 metres
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
Solution:
As given, we have,
The cost of one pen = 36 Rs.
So, the cost of 15 pens = 36 × 15 = 540 Rs.
The cost of one book = 45 Rs.
So, the cost of 12 books = 45 × 12 = 540 Rs.
The cost of one pencil = 8 Rs.
So, the cost of 10 pencils = 8 × 10 = 80 Rs.
Now,
the cost of each eraser is 40 Rs. less than the combined costs of pen and pencil.
So,
Combined costs of pen and pencil = 36 + 8 = 44 Rs.
Cost of one eraser = 44 – 40 = 4 Rs.
So, the cost of 5 erasers = 4 × 5 = 20 Rs.
Hence,
The total amount spent is
Hence, the total amount spent is 1180 Rs.
10%=394;50%=1970;250%=9850;30%=1182;
250%+30%=9850+1182=11032
say the work is w and let no of days taken by b is ‘x’ which
we have to calculate
so work done by a in one day is w/6
work done by b in one day is w/x
a and b together can do work in 4 days ie=(w/6)+(w/x)=(w/4)
solving equation x=12
so no of days taken by b=12
Maximum number of edges = 9. Start from one corner. Select any face including that corner. Complete a square (4 edges) around the face to reach at the starting corner point . Now, move to the opposite face through the edge joining them and passing through the starting point(1 edge). Now, complete the square of edges around this face(4 edges). Total = 4+1+4 = 9 edges
Hog
.
1875
Friends,
The Answer given by ‘Gaurav Sharma’ is correct and
the approach (bottom to top) suggested by ‘Shailesh’ is
good. But with minor correction we can arrive the solution
using this approach:
After 5th loot, No. of breads left = 3
after 4th loot, no. of breads left = (3+0.5)x2 = 7
after 3rd loot, no. of breads left = (7+0.5)x2 = 15
after 2nd loot, no. of breads left = (15+0.5)x2 = 31
after 1st loot, no. of breads left = (31+0.5)x2 = 63
So, before 1st loot, no. of breads left = (63+0.5)x2 = 127
Solution # 15-18
Sitting solution be- D T M B H R
Ans 15 :Mr. D
ans 16 : 1 2 3
Ans 17 : 3
Ans 18 : Mr B Suffering from anemia.
madras
7, 8, 18, 57, 228, 1165, 6996
Ans : 228
7
(7*1)+1=8
(8*2)+2=18
(18*3)+3=57
(57*4)+4=232 [ given 228 ] odd
(232*5)+5=1165
(1165*6)+6=6996
251
0987654321