Maryland state department of assessments and taxation Interview Questions, Process, and Tips

Ques:- You have a bag of with ‘N’ number of strings. At random, you pull out a string’s end.You pull out another string end and you tie the two together.You repeat this until there are no loose ends left to pull out of the bag.What is the expected number of loops?
Ques:- 28% of 450 + 45% of 280 = ?
Recent Answer : Added by Talib Mansuri On 2022-05-17 08:54:05:

252

Ques:- The areas of the two spheres are in the ratio 1: 4. What is the ratio of their volume ?
Recent Answer : Added by BINDHU REDDY On 2021-08-09 01:51:51:

1/8

Ques:- A room is 15m long, 4m broad and 3m height. Find the cost of white washing its four walls at 50p per m2 ?
Recent Answer : Added by Sourabh Singh Rawat On 2021-10-10 19:03:37:

2*3(15+4)=114
114*1/2=57 rs

Ques:- In each questions below are given two statements followed by two conclusions numbered I and II.
1. Statements :
No bat is ball. No ball is wicket.
Conclusions :
I. No bat is wicket.
II. All wickets are bats.
A. if only conclusion I follows
B. if only conclusion II follows
C. if either conclusion I or II follows
D. if neither conclusion I nor II follows
E. if both conclusions I and II follow
Ques:- What is your achievement in the current company?
Ques:- Why you want to leave your job?
Ques:- On a sunny morning, a greengrocer places 200 kilograms of cucumbers in cases in front of his shop. At that moment, the cucumbers are 99% water. In the afternoon, it turns out that it is the hottest day of the year, and as a result, the cucumbers dry out a little bit. At the end of the day, the greengrocer has not sold a single cucumber, and the cucumbers are only 98% water. How many kilograms of cucumbers has the greengrocer left at the end of the day?
Recent Answer : Added by Rama On 2022-08-14 16:28:56:

198.20

Ques:- During a given week a programmer spend 1/4 of his time preparing charts,3/8 of his time for coding,rest of his time for debugging the programs.If he had 48 hrs during the week how many hours did he spend debugging the program
Ques:- A number when, 28 subtracted from it reduces to its one third. What is the value of 50% of that number?
Recent Answer : Added by K R ESWAR REDDY On 2021-09-29 16:49:53:

x-28=(1/3)x
x= 42

50 %of 42 = 21

Ques:- Tell us about a challenging situation you have faced. What was the situation and how did you cope with it?
Ques:- What is my goal in this industry?
Ques:- The food in a camp lasts for 30 men for 40 days. If ten more men join, how many days will the food last?
Ques:- The sum of the square of the three consecutive even natural numbers is 1460. Evaluate the numbers?
Recent Answer : Added by shraddha On 2022-05-17 09:06:40:

let square be x (squares are 4 sides)
i.e., X+X+X+X=4X
4X+3=1460
4X=1460-3
4X=1457
X=364.25

Ques:- Tell me something about your home town?
Ques:- ANY BACKGROUND FOR BDM
Ques:- 1. Last exp. 2. Part time or full time 3. Typing speed 4. Why you wish to join?
Ques:- The PSLV-C12 was successfully launched into space from t h e Satish Dhawan Space Centre at Sriharikota on 28 April, 2009. PSLV stands for?
Ques:- There are 50 families in a village each consisting of a husband and a wife. Each woman knows all the men who are thieves except her husband. Now the king announces that there is at least one thief in the village. What happens then?
Ques:- Why have you been out of work so long, and how many others were laid off?
Ques:- What is the difference between confidence and over confidence?
Ques:- A cylinder is 6 cms in diameter and 6 cms in height. If spheres of the same size are made from the material obtained, what is the diameter of each sphere?
Ques:- HOW LONG YOU HAVE BEEN IN THIS INDUSTRY
Ques:- What is the normal shrinkage percentage of Khadi afterfirst wash?
A. 10
B. 7
C. 8
D. 5
E. 9
Recent Answer : Added by Indranil Nitin Apte On 2021-08-08 09:30:36:

b

Ques:- A bakery opened with its daily supply of 40 dozen rolls. Half of the rolls were sold by noon and 60% of the remaining rolls were sold between noon and closing time. How many dozen rolls were left unsold?
A. 6
B. 7
C. 8
D. 10
Recent Answer : Added by Bhuvnesh Jain On 2022-01-16 17:16:55:

8

Ques:- What do you like (not like) in this job?
Ques:- Current General Knowledge
Ques:- Why I hire you and why i don't hire you?
Ques:- What is international staffing or consulting?
Ques:- A man swims downstream 72 km and upstream 45 km taking 9 hours each time; what is the speed of the current?
Recent Answer : Added by Admin On 2022-09-29 16:19:13:

Explanation:

72 — 9
? —- 1

=> Down Stream = 8

45 —- 9
? —- 1

=> Up Stream = 5

Speed od current S = ?

S = (8 – 5)/2 = 1.5 kmph.

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top