Manulife asset management Interview Questions, Process, and Tips

Ques:- How many tangents can be drawn with in three circles if they do not lie with in each other
Recent Answer : Added by Admin On 2020-05-17 12:01:17:

we can draw 12 tangents, 4 for 2 circles and 12 for 3
circles

Ques:- A works twice as fast as B. If B can complete a work in 12 days independently, the number of days in which A and B can together finish the work is?
Ques:- What r u neet first family money carier? and why ?
Ques:- A cube of side 4cm is painted with colors red,blue,green in such a way that opposite sides are painted in the same colour . this cube is now cut into 64 cubes of equal size .then 1) how many have atleast two sides painted in different colours.2) how many cubes have only one side painted.3) how many cubes have no side painted4) how many have exactly one side not painted.
Ques:- What do you find good in your present company.
Ques:- Do you have any serious medical issues?
Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Ques:- x==2+2^(2/3)+2^(1/3) .Then what is the value of x^3-6X^2+x ? here X^Y indicates X to the power of Y.
Recent Answer : Added by Admin On 2020-05-17 12:04:34:

(x-2)^3==x^3-6x^2+12x-8
(x-2)^3==(2^(2/3)+2^(1/3))^3
therefore,by solving
Ans: x^3-6x^2+x== -8-5*2^(2/3)-5*2^(1/3)

Ques:- You are working in your organization from 3 months. why do you want to live?
Ques:- A man came from usa , he was fat so he decided to walk to reduce fat in his body. So he daily starts walking at exactly at 3pm he walks at 4km/hr for some distance and then 3km/hr on inclined road while going up. And 6km/hr while coming dow?
Ques:- One train leaves Los Angeles at 15mph heading for New York. Another train leaves from New York at 20mph heading for Los Angeles on the same track. If a bird, flying at 25mph, leaves from Los Angeles at the same time as the train and flies back and forth between the two trains until they collide, how far will the bird have traveled?
Recent Answer : Added by Admin On 2020-05-17 12:01:54:

insufficient information distance between LA and NY is not
given it should be given to find the no solution

Ques:- How would you know you were successful on this job?
Ques:- Where U will charge Propane for make up during compressor unit running
Ques:- How will you work in entry level?
Ques:- 19 boys turn out for hockey. Of these, 11 are wearing hockey shirts and 14 are wearing hockey pants. There are no boys without one or the other. The number of boys wearing full uniform is
Recent Answer : Added by Admin On 2020-05-17 12:03:17:

( C ) 6

Ques:- A train 270 meters long is moving at a speed of 25 km/hr. It will cross a man coming from the opposite direction at a speed of 2 km per hour is
A. 24 seconds
B. 28 seconds
C. 32 seconds
D. 36 seconds
Recent Answer : Added by anonymous On 2022-03-09 16:38:02:

270/(27*1000)*3600=36

Ques:- Find the cost of fencing around a circular field of diameter 28 m at the rate of Rs.1.50 a meter?
Recent Answer : Added by Prachi Bees On 2021-12-10 16:35:10:

In the example first we have to find the area of the field

we have given the following values ,

cost of fencing per meter = Rs 1.50

Diameter of circular field = 28

We have to find the area , a = ?

We know that,

Area = 2 π r

= 2 x 22/7 x 14

= 2 x 22 x 2

= 44 x 2

= 88 sq. m

So, area of circle is 88 sq.m

Now just multiply it with 1.50

cost of fencing = 88 x 1.50

= Rs. 132

So, the cost of fencing the circular field is Rs. 132

Ques:- Explain your organization chart and your position in the same?
Ques:- X can do a piece of work in 4 days. Y can do it in 5 days. With the assistance of Z they completed the work in 2 days. Find in how many days can Z alone do it?
Ques:- Can you explain why should we select you fromthe number of applications we have received?
Ques:- What is the importance of political science meaning of state what is nature?
Ques:- About the number of pairs which have 16 as their HCF and 136 as their LCM, we can definitely say that
A. Only one such pair exists
B. No such pair exists
C. Only two such pairs exist
D. Many such pairs exist
Recent Answer : Added by Admin On 2022-09-23 18:49:19:

B. No such pair exists

Ques:- How many minimum number’s of whole square slabs are required for paving the floor 12.96 meters long and 3.84 meters side?
Ques:- What is your work experience and how do you give your best to our company
Ques:- Why do you want to leave the current company?
Ques:- When you have worked on a team, and your role was crucial, what was that role? In what way was this team effort different or similar to working on your own?
Ques:- Why you took 6 years to complete your graduation.
Ques:- Some of the friends decided to go on a picnic they decided to go on a bike if the biker decided to take one pillion with him then there is no means of travel for the people as equal to the no of bike + 1. if they decided to go on two trip three bike r left unused in the second trip find the no of person having bike?
Recent Answer : Added by Admin On 2020-05-17 12:03:16:

If there are n bikes then the no. of people are 2n+1. n are dropped in firs trip, in second trip 3 bikes are unused, so 2n-3 + n covers 2n+1 people. i.e. n + 2n – 3 = 2n +1
n = 4
No. of people = 9

Ques:- Type of Ram
Ques:- Who is close to you in your brothers and sister and why ?

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.