- Mango (management accounting for ngos) General Aptitude Interview Questions
- Mango (management accounting for ngos) Trainee Interview Questions
- Mango (management accounting for ngos) Personal Questions round Interview Questions
- Mango (management accounting for ngos) HR Interview Questions
- Mango (management accounting for ngos) Lead Interview Questions
Day 1: 30-3ft = 27+2ft = 29
Day 8: 23 jumps 3ft = 20 slips 2ft = 22
Day 16: 13 jumps 3ft = 10 slips 2ft = 12
Day 24: 3 jumps 3ft = Out?
the answer is E
2*3*5*7*11*13*17*19=9699690
1, 2, 4, 8, 16, 32, 64, (…..), 256
128
Days taken by A to complete whole work= 140 days
Days taken by B to complete whole work= 105 days
A’s 1 day work= 1/140
B’s 1 day work= 1/105
On adding these together we get: 1/60 (1 day work by working together)
So, together they will be able to complete it in 60 days
If a blue stone is thrown into a red sea, several things could happen depending on the context and the properties of the stone and the sea:
Symbolically: Since blue and red are contrasting colors, the interaction of a blue stone in a red sea could be seen as a visual or metaphorical contrast. It could represent a stark difference or an unexpected element introduced into an existing situation.
Scientifically: In reality, the color of the stone and the sea would not have a direct physical impact on each other. The stone would sink or float based on its density and the water’s buoyancy. The color of the water, whether red or any other color, does not change the fundamental principles of objects interacting with liquids.
It’s important to note that red seas, in the context of bodies of water, typically do not exist naturally. The phrase “red sea” is often used metaphorically or symbolically rather than referring to an actual body of water with a red color.
if rs 12 and rs 15 per meter then 750*12+750*15
1052
C. 8 kg
28
to arrange m objects in n places => nCm
i.e. for this example m=2(+,- sign) and n = 8(places between two number from 1 to 9)
SO, answer is : 8C2 = (8*7) / 2 = 28
A will finish work in 8 days (4days with B and 4 days with C).
Let 10’splace digit is x and unit’s place digit y
First milestone : 10x+y
Second milestone : 10y+x
Third milestone: 100x+y
Since the speed is uniform so
Distance covered in first Hr = Distance covered in Second Hr
(10y+x)-(10x+y) = (100x+y)-(10y+x)
After solving, we get —-> y=6x but since x and y are digits so only possible combination is x=1 and y=6,
So average speed = 45 KM/HR