Train speed 90 km /h
1st we have to change in m/s. then 90*5/18=25m/s
Then d=speed*time
=25*10=250m train length
2*3(15+4)=114
114*1/2=57 rs
Burn Rope One first, it will burn in 30 mins.Mark 30 mins and at the end of 30 mins now burn second rope from both sides (15 mins it will take ),and simultaneously burn third and last rope until it is half left.30+15= 45 , Remaining time 7.5 mins.By this time last rope is burnt half ,and now burn it from both sides as well it will exhaust in 7.5 mins. 30+15+7.5=52.5 measured.
underroot(1-r^2)/3
12
1200 meter
B. 32%
100
“RAW”:
RAW IS AN INDIAN INTILLIGENCE WING.
“RESEARCH AND ANALYSIS WING”
as total 16 floors out of them 11 were rented to A and B company .So remaining floors are 5 and each floor is 12000s.ft
So remaining = 12000*5
=60000
Example 1:
Assign, A=20, B=10, C=5, D=5(Because C is equal to D as
given), E=1.
A/B = 20/10 = 2. So A/B = 2
A/C = 20/5 = 4. So A/C = 4
A/E = 20/1 = 20. So A/E = 20
Therefore “A/E is Greatest”
Example 2:
Assign, A=100, B=50, C=20, D=20(Because C is equal to D as
given), E=10.
A/B = 100/50 = 2. So A/B = 2
A/C = 100/20 = 5. So A/C = 5
A/E = 100/10 = 10. So A/E = 10
Therefore “A/E is Greatest”
41, 43, 47, 53, 61, 71, 73, 81
81
( C ) Crawl
Robin =72
Dravid = 98
Azhar = 22
Sachine = 98
Total score = 290
The answer probably lies in finding the in-centre of the
traingle. Bisect all the angles of the triangles and the
point where these angle bisectors meet gives u the point P
Mixture is 1.2 L of A + 2.4L of B which is 3.6L total. 1.2L / 3.6L = 1/3 (0.33)
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
She is My grandmother