Answer:50.24
Explanation:
Area of a circle =π*r*r
616=π*r*r
r*r= 616÷3.14
r*r =196
r =13
Circumference of a circle= 2*π*r
=2*π*13
=16*3.14=50.24
Answer:
Since the car has met the person 20 minutes before hand, it has actually saved 10 mins of journey (to and fro)
since the man has started 1.30 hrs before and car has met him 10 mins before actual time he takes to reach daily is 1hr and 20 mins
3hour 45 min = 13500 sec
In 1 sec he covers = 12 m
In 13500 sec he covers = 12×13500 m = (12×13500)/1000 km = 162 km
Ans : 162 km
2.5 sec
2.88
8+1=9
9+2=11
11+3=14
14+4=18
18+5=23
and finally
23+6=29
Answer: 1 / 3
Lets say each brand had 16 laptops
So Sold : A = 3 , B= 1 and C = 12 , total sold: 16 ,
Since each brand has 16 , total = 48
so 16/ 48 = 1/3 is the sold fraction
Let A, B and C be the three 6-faced dice.
Then, according to the question,
Since two dices has to be equal, that value can be any of the 6 faces, i.e., 6C1 cases.
Now for each case, 2 equal dices can be selected from 3 dices in 3C2 i.e., 3 ways.
And for each of the above, the third dice can have any of the 5 remaining faces
The possible outcomes are P(A)=61,P(B)=61,P(C)=65,P(A)=61,P(B)=65,P(C)=61 and P(A)=65,P(B)=61,P(C)=61
Hence the required probability = 61×61×65×6×3=21690=125
Pen can’t be sharpened by sharpener
Pencil is only sharpened by sharpner
Likewise rigth man can only fill the rigth position so we have to select it. This is human resource recruiting.
In school teachers manage and motivate you to do your work.
The same is done to employees this is hrms
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
6/11 or 54.54%