Answer: Option C two
9
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
b
1.5 km/hour
No of men employed = N
No of days to finish the work = 9 days
No of men after increase = (N + 10)
No of days to finish the work = 6 days
Equating mandays
9N = (N+10)*6
9N — 6N = 60
3N = 60
N = 20
No of men employed = 20
9 sec=4 times
x sec=12 times
x=(9*12)/4=27 sec
I think speed of printing per minute has nothing do to with how long printer being at work.
If “given day” = 8 hours.
8h = 480m
x = 176400 / 480 = 367.5 lines per minute.
500 ways
The 3-digit number can be written as the sequence [n, 2n, 3n]
n = 1 → [1, 2, 3] → valid
n = 2 → [2, 4, 6] → valid
n = 3 → [3, 6, 9] → valid
n = 4 → [4, 8, 12] is not valid because this would lead to a 4-digit number
any value of n > 4 would also produce invalid answer
Answer: Three numbers: {123, 246, 369}
Pfull = 4 Hrs; Qfull = 5 Hrs
Assume velocity Vp = x then Vq = 4/5 x –> avg velocity = (5/5 + 4/5) / 2 = 0.9
If fastest time = 4hrs then the time it would take to fill up tank by alternating is 4/0.9 = 4.44 Hrs
My standard for success is to build confidence, be able to earn money, and meet people.