Blue
5 * 6 * 7 = 210 ,
Two Least No’s are 5,6
There fore 5+6=11 is answer
38 / 2 = 19 – 5 = 14 years old
Reliable Assistance: I promise to provide reliable and accurate assistance in answering questions, providing information, and engaging in meaningful conversations. I strive to deliver helpful and relevant responses to the best of my abilities, drawing from the vast knowledge and information I have been trained on.
Continuous Improvement: I promise to continuously improve my capabilities and expand my knowledge base. As technology evolves and new information becomes available, I aim to stay up-to-date and provide the most accurate and relevant information possible. I strive to enhance my understanding of different topics and improve the quality of my responses over time.
Respectful and Ethical Interaction: I promise to interact with users in a respectful and ethical manner. I am programmed to respect user privacy, confidentiality, and cultural sensitivities, aiming to provide a positive and helpful experience for those who engage with me.
Please note that while I can provide valuable assistance and information, there are certain tasks that may be better suited for human professionals with expertise in specific fields.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
LCM=48
Then add remainder 3
ans =51
Marks in thrice in english as in science
so if science marks is x
then english marks = 3x
lets maths marks = y
ratio of english and maths marks is
3x/y = 3/5
=> y = 5x
and total marks = 162
3x + x + 5x = 162
x = 18 —-answer
1 through 24, divisible by 2 in descending order.
That leaves you with:
24, 22, 20, 18, 16, 14, 12, 10, 8, 6, 4, 2
8th place FROM the bottom means your answer will be 16.
8 cubes
So as to prevent unauthorized persons from entering and reducing vandalism