26
C. 20
let x be sum.
SI of 18% for 1 year= x*18/100=0.18x;
SI of 18% for 2 years is 0.36x;
SI of 12% for 1 year= x*12/100=0.12x;
SI of 12% for 2 years is 0.24x;
Given, 0.36x-0.24x=840
0.12x=840
x=840/0.12=7000.
Let the total number of matches to played in the tournament be ‘x’.
Given that A county cricket team has won 10 matches and lost 4.
That means total number of matches played = 14.
So,
= > 70% of x = 14
= > (70/100) * x = 14
= > 70x = 1400
= > x = 20.
So, the number of matches to be played = 20.
They have a record of exactly 75% wins = 20 * 75/100
= > 15.
Therefore, the number of matches should the team win = 15 – 10 = 5.
Hope this helps!
Train speed 90 km /h
1st we have to change in m/s. then 90*5/18=25m/s
Then d=speed*time
=25*10=250m train length
Before Swapping
_ _ _ _ _ _ _ Shilpa ……..Reena _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
After Swapping
_ _ _ _ _ _ _ Reena _ _ _ _ _ Shilpa _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
—————————–>14=17 <——————————-
So total number of girls in that row are 30
take goat from one side and leave it another side and then come back another side and carry cabbage from one side leave it near goat and carry goat back to other side and then carry wolf leave it another side with cabbage come back to
goat side and carray goat to other side not all three are there on another side
$150000
2:1
I keep myself connected to social networking sites, the first platform for any technological advancement news and also keep surfing on the latest technology on the internet”. You can even say that you are connected to professional people from different media and have a continuing conversation with them regarding the growing technologies.
ans: 250 rs exactly
sunday
D. 17 : 3
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
b
In the example first we have to find the area of the field
we have given the following values ,
cost of fencing per meter = Rs 1.50
Diameter of circular field = 28
We have to find the area , a = ?
We know that,
Area = 2 π r
= 2 x 22/7 x 14
= 2 x 22 x 2
= 44 x 2
= 88 sq. m
So, area of circle is 88 sq.m
Now just multiply it with 1.50
cost of fencing = 88 x 1.50
= Rs. 132
So, the cost of fencing the circular field is Rs. 132
1/24+1/30+1/40=1/10 => 10 days
4/10 = 0.4
1/(24*0.4)+1/(30*0.4) = 0.1875 => 5.33
(10-4) + 5.33 = 11.3 days