- Infinity software development General Aptitude Interview Questions
- Infinity software development Trainee Interview Questions
- Infinity software development Personal Questions round Interview Questions
- Infinity software development HR Interview Questions
- Infinity software development Lead Interview Questions
4
23.5 days
Ans alphabet = Q alphabet – 1
CHRONRD
– While the train is moving, the jogger will also be running in the same direction.
– for the head(engine) of the train to get to the current position of the jogger 240m away, it will take:
45km/hr => 12.5m/s => 240/12.5 = 19.2 seconds.
– But in the same period of time, the jogger will still be running and will have moved to a new location by: 9km/hr => 2.5m/s => 2.5 * 19.2 = 48m
To get to the new location at the speed of 12.5m/s will take the train:
48/12.5 = 3.84sec
In this additional time, the jogger will move forward by:
3.84 * 2.5 = 9.6m
at a speed of 12.5m/s, it will take the train less than a second to cover the additional 9.6m
If we add the distance the jogger will cover in 1 second to 9.6, it is still less than what the train can cover per second. let us see (9.6 + 2.5 = 12.1)
Therefore, the head of the train will pass the runner at approximately: 19.2 + 3.84 + 1 => 24.04 seconds.
For the train to completely pass the runner, it will need its whole length of 120m to be in front of the runner.
This will take an additional (9.6 + 2) seconds.
Therefore for the length of the train to be ahead of the runner it will take approx. 35.65 (24.04 + 9.6 + 2) seconds
40
40
30
60
– 10 cows
+ 20 days
if 40 cows can eat for forty days
then 20 cows can eat for 80 days
6/(2+3)-(2+3)/6
=6/5-5/6
=(36-25)/30
=11/30
ans is 11/30
33
From the first statement
Speed=distance/time
=>240/24=10m/s
so speed=10m/s
From the second statement
distance=length of the platform+length of the train=650+240=890m
Time=distance/speed
here, the speed of the train is already calculated
=>890/10=89s
So the time taken by the train to cross the platform is 89 seconds
One day work = 1 / 20
One mans one day work = 1 / ( 20 * 75)
Now:
No. Of workers = 50
One day work = 50 * 1 / ( 20 * 75)
The total no. of days required to complete the work = (75 * 20) / 50 =
30