Complete step-by-step answer:
Investment made by A for 1 year, IA=2000
Investment made by B for 2 year,
IB=2×3000IB=6000
Investment made by C for 2 year,
IC=2×4000IC=8000
The ratio of their investment is given by
IA:IB:IC=2000:6000:8000
To simplify the ratio divide it by 1000,
IA:IB:IC=2:6:8
Now again to simplify divide the ratio by 2,
IA:IB:IC=1:3:4
The total parts of this investment =1+3+4=8
A’s share in the investment is 1 out of the 8 parts; B’s share is 3 out of 8 while C’s share is 4.
Therefore, the profit share of A’s investment of Rs. 2000=18×3200=400.
( e ) Apple
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
45
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
Answer: 600m
Explanation:
Distance covered by Amar = 18/4.8 (1.6km) = 3/8(1600) = 600 m
Ravi do a work in 30 days
Prakash do a work in 40days
then both work together 1/30+1/40=70/1200
then solve values 120/7 is 17(1/7) days
26
I think speed of printing per minute has nothing do to with how long printer being at work.
If “given day” = 8 hours.
8h = 480m
x = 176400 / 480 = 367.5 lines per minute.
=12.05×5.4/0.6
=12.05×9.0
=108.45
1208.9
Reading your question