Hi-Rel Electronics Interview Questions, Process, and Tips

Ques:- Two trains starting at same time, one from Bangalore to Mysore and other in opposite direction arrive at their destination 1 hr and 4 hours respectively after passing each other.How nuch faster is one train from other?
Recent Answer : Added by Admin On 2020-05-17 12:04:20:

Its 2 times faster than the other train
v1*t=v2
v2*t=4*v1
solving these two,we get
v2/v1=2

Ques:- The wheels revolve round a common horizontal axis. They make 15, 20 and 48 revolutions in a minute respectively. Starting with a certain point on the circumference down wards. After what interval of time will they come together in the same position?
Ques:- ABOUT THE SUBJECT & PERSONAL ROUND
Ques:- Why do you need this job ?
Ques:- Describe to me in detail a time when you took the initiative in a major project.
Ques:- When your credibility is compromised, what steps do you take to rectify the situation?
Ques:- Two trains travel from NewYork to Washington and the travel takes 5 hours journey time.Trains leave from Washington for every hour and an half hour and the trains leave from NewYork every hour. If the train leaves from new york , Then how many trainsfrom washington cross this train on its way?
Recent Answer : Added by Subramani Raju On 2021-07-23 15:26:02:

5 trains

Ques:- Ramesh can finish a work in 20 days and Sushil in 25 days. They both work together for 5 days and then Sushil goes away. In how many days will Ramesh complete the remaining work?
Recent Answer : Added by DK BOSS On 2021-07-17 10:05:29:

Answer:
11 days.

Step-by-step explanation:
In the question,

Time taken by Ramesh to finish a piece of work = 20 days

Time taken by Sushil to finish a work = 25 days

Time for which they worked together = 5 days

Sushil left after = 5 days

So,

One day work of Ramesh is,

One day work of Sushil is,

So,

Work done in 5 days is given by,

Therefore, Remaining work is given by,

Now, as the Sushil left the remaining work was done by Ramesh,

Time taken by Ramesh for the remaining work is,

Therefore, the remaining work will be completed in 11 days by Ramesh.

Ques:- My family background.
Ques:- The HCF of two numbers is 11 and their LCM is 7700. If one of these numbers is 275, then the other one is
A. 918
B. 308
C. 283
D. 279
Recent Answer : Added by narendra On 2022-09-18 09:03:28:

b

Ques:- From a pack of cards two cards are drawn one after the other, with replacement. The probability that the first is a red card and the second is a king is -.
Recent Answer : Added by Admin On 2022-09-29 19:02:13:

Explanation:

Let E1 be the event of drawing a red card.

Let E2 be the event of drawing a king .
P(E1 ∩ E2) = P(E1) . P(E2)
(As E1 and E2 are independent)
= 1/2 * 1/13 = 1/26

Ques:- Was Manmohan Singh the governor of RBI?
Ques:- Consider an n by n grid of squares. A square is said to be a neighbour of another one if it lies directly above/below or to its right/left. Thus, each square has at most four neighbours. Initially, some squares are marked. At successive clock ticks, an unmarked square marks itself ifat least two of its neighbours are marked. What is the minimum number of squares we need to mark initially so that all squares eventually get marked?
Ques:- Why do you want to get this job?
Ques:- U r now executive tomorrow ur going to become frontlinemanager 5 sub-ordinates under u. two of them are ur friendsand three of them r seniors to u. how u will handle them?
Ques:- What gets you up in the morning?
Ques:- My father’s name A.Kasi, he is car driver. My mother’s name K.Lakshmi, she is housewife. I have one elder brother.
Ques:- Two pipes X and Y can separately fill a cistern in 18 and 24 hours respectively. If they are turned on alternately for one hour each, how long will it take to fill the cistern?
Recent Answer : Added by Admin On 2022-09-28 17:08:06:

X filling rate is 1/18 or 4/72 per hour

Y filling rate is 1/24 or 3/72 per hour

Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence

72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72

So at 20.5 hours with X turn filling is 100% complete with 72/72

Answer: It will take 20.5 hours to completely fill this tank.

Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share

Ques:- Five boys were climbing a hill. J was following H. R was just ahead of G. K was between G & H. They were climbing up in a column. Who was the second?
Ques:- 3,3,5,4,4,-,-,5,4,3, find the blanks of given series
Recent Answer : Added by Admin On 2020-05-17 12:04:19:

the series will be like that
3,3,5,4,4,3,5,5,4,3
because
1 contains 3 alphabets so 1st element is 3 (ONE)
then 2 contains (TWO) alphabets and so on
the series will be as above

Ques:- How will you work in entry level?
Ques:- Nanda Devi peak forms a part of(a) Assam Himalayas(b) Kumaon Himalayas(c) Nepal Himalayas(d) Punjab Himalayas
Ques:- Difference between JSP & servlets.
Recent Answer : Added by GMK On 2021-08-06 04:58:03:

Servlets are faster as compared to JSP, as they have a short response time.
JSP is slower than Servlets – JSP is a HTML-based codes.
Servlets are harder to code, as here, the HTML codes are written in Java – JSPs are easier to code, as here Java is coded in HTML.
In an MVC architecture, Servlets act as the controllers. – In MVC architectures, the JSPs act as a view to present the output to the users.
The service() function can be overridden in Servlets. – The service() function cannot be overridden in JSPs.

Ques:- An individual pays 30% income tax. On this tax he has to pay a surcharge of 10%. Thus the net tax rate, he has to pay is
A. 27%
B. 33%
C. 40%
D. 45%
Recent Answer : Added by narendra On 2022-09-18 09:02:30:

b

Ques:- Six persons A,B,C,D,E & F went to solider cinema. There are six consecutive seats. A sits in one of the seats followed by B, followed by C and soon. If a taken one of the six seats , then B should sit adjacent to A. C should sit adjacent A or B. D should sit adjacent to A, B,or C and soon. How many possibilities are there?
Ques:- Tell me about your self and past job
Ques:- What is your contribution of the Branch?
Recent Answer : Added by Pallavi On 2022-04-02 06:59:53:

Very great things your doing

Ques:- Describe briefly your standards of success?
Ques:- The sides of a triangle are in the ratio 5: 12: 13 and its perimeter is 300 m, Evaluate the area of the triangle ?
Recent Answer : Added by Tushar Singh On 2022-03-09 16:33:29:

As it is a right angled triangle so we know the hypotenuse must be 13 and 5 & 13 are base and height (in any order).
Area of triangle = 0.5* base * height = 0.5 * 5 * 12 = 30

Ques:- In a class composed of x girls and y boys what part of the class is composed of girls?
Recent Answer : Added by marjorie nalunkuma On 2021-10-12 12:53:14:

x

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top