125, 123, 120, 115, 108, 100, 84
b
9
9/25
the answer is At 9:48 PM
At 1:00 pm the difference between A & B = 8 km
after 2:00 pm ………………. = 11 km (as B’s speed
is 1 and A’s 4 km, then eqv speed=(4-1)=3 km)
After 3:00………………….. = 13 km (as B’s speed 2 km)
After 4:00………………….. = 14 km
after 5:00………………….. = 14 km (A’s speed= B’s
speed)
after 6:00………………….. = 13 km
after 7:00………………….. = 11 km
after 8:00………………….. = 8 km
after 9:00………………….. = 4 km
and now the eqv speed is= (9-4) =5 km/hr;
and the renaming distance is 4 km;
then, time=(60*4)/5=48 min;
then the meeting time is=9:00+48 min=9:48 pm;
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
A. Christian Dior
10000
32
76
17