- Graphic designer & multimedia specialist General Aptitude Interview Questions
- Graphic designer & multimedia specialist Trainee Interview Questions
- Graphic designer & multimedia specialist Personal Questions round Interview Questions
- Graphic designer & multimedia specialist HR Interview Questions
- Graphic designer & multimedia specialist Lead Interview Questions
Answer is 274 .
Let the required term be x.
Pattern :- 1) Find the difference between consecutive terms as :
2 – 1 = 1
4 – 2 = 2
13 – 4 = 9
31 – 13 = 18
112 – 31 = 81
2) Now write the above numbers obtained by differences in series as :
1, 2, 9, 18, 81, y
(Suppose y be next term after 81.)
3) Look the difference series carefully and it follows the below pattern as :
(9 * 2)/1 = 18
(18 * 9)/2 = 81
(81 * 18)/9 = 162 = y (the next term after 81)
Thus the required answer is :
x = 112 + y
x = 112 +162 =274
Joe is fencing in a square area of 576 square feet.
Fence posts, which are needed every three feet, cost 32.00 each.
The fencing cost 4.50 per foot. What is the total cost of the fencing materials?
Solution:-
Area of Square is 576 sq ft.
so, the length of side = root(576) = 24 ft
Since the fencing would be done on the perimeter, we would need that
formula is 4*side = 96 ft.
Number of Fence post needed = 96/3 = 32
1 Fence post cost = 32
32 Fence Post cost = 32 * 32 = 1024
Fencing cost = Perimeter * fencing cost = 96 * 4.5 = 432
Total Cost = 432 + 1024 = 1456
1%=50
12%=600
Answer is 45
First we need to subtract those reminders from the respective numbers, then we have to find the hcf of two numbers(numbers got from the subtraction) then you will get the answer.
So,
After subtraction you will get
3026-11 = 3015
5053-13 = 5040
HCF of these two numbers
5 | 3015 5040
3 | 603 1008
3 | 201 336
| 67 112
We can’t find a common diviser since 67 is a prime number
So the HCF = 5 * 3 * 3
= 45
5*3*3 = 45
as a student iam intrested in learning new things.as a fresher i learnt this subject theoretically and iam waiting for an oppurtunity to do them in practical way if you hire me then i will give my best to increase companies reputation
20km
270
3600 sec in 1 hr.. 1000 M in 1 km so to covert m/s to km /hr you multiply the value with (3000/1000) .. so 3000 divided by 1000 will give you 18/5 it’s like constant value.. to convert m/s to km/ hr we can use this 18/5.. hope you understand
The hour hand advances between individual numbers as the minute hand makes a full path around the hour. The hour hand was pointing directly at 3 at 3:00, but at 3:15 it has advanced 1/4 of the way between 3 and 4. The number of degrees between numbers 30 (because 360/12). That gives you 30/4 = 7.5. The number of degrees between the two hands is 7.5 degrees.
If the bell rung when they r started is also counted then it
will be 5 otherwise 4
99/1020
x