Grant associates inc Interview Questions, Process, and Tips

Ques:- Mr. Shah decided to walk down the escalator of a tube station. He found that if he walks down 26 steps, he requires 30 seconds to reach the bottom. However, if he steps down 34 stairs he would only require 18 seconds to get to the bottom. If the time is measured fromthe moment the top step begins to descend to the time he steps off the last step at the bottom, find out the height of the stair way in steps?
Recent Answer : Added by Palash Kose On 2021-12-04 15:02:28:

46

Ques:- When an object like cube or sphere is seen along x,y,z,axes we get the same.Apart from these suggest another which has similar characteristics?
Recent Answer : Added by Admin On 2020-05-17 12:01:27:

Triangular Prism

Ques:- Past work experience.
Ques:- A train speeds past a pole in 15 seconds and a platform 100 m long in 25 seconds.What is Its length ?
Recent Answer : Added by Satwick On 2021-10-28 16:06:12:

Let’s say, length of train = x metres
Speed at pole = Speed at platform
x/15 = 100+x / 25
5x = 300 + 3x
2x = 300
x = 150m
So, train is 150 metres long.

Ques:- The diameters of two spheres are in the ratio 1:2.Find the ratio of their volumes?
Recent Answer : Added by Harshitha On 2022-03-19 16:02:13:

Ratio of diameters=1:2
Ratio of radius=1:2
Ratio of volumes=(4/3*3.14*r1^3)/(4/3*3.14*r2^3)
=r1^3/r2^3=1^3/2^3=1/8

Ques:- How do energy saving management system work?
Ques:- A man swims downstream 72 km and upstream 45 km taking 9 hours each time; what is the speed of the current?
Recent Answer : Added by Admin On 2022-09-29 16:19:13:

Explanation:

72 — 9
? —- 1

=> Down Stream = 8

45 —- 9
? —- 1

=> Up Stream = 5

Speed od current S = ?

S = (8 – 5)/2 = 1.5 kmph.

Ques:- Technical languages known
Ques:- Finish the series : 5,6,7,8,10,11,14,..?
Recent Answer : Added by Admin On 2022-09-29 17:21:33:

In the given series 5,6,7,8,10,11,14…
There are two series
First is 5,7,10,14…
Second is 6,8,11….
First series
5+2=7
7+3=10
10+4=14
Second series
6+2=8
8+3=11
11+4=15
Hence complete series is 5,6,7,8,10,11,14,15…

Ques:- Sanskriti Award 2006 for Literature has been awarded to?
Ques:- 1/8 is devided by ‘s’ , if ‘s’ is incresed by 2 times, what is the result?
Recent Answer : Added by Admin On 2020-05-17 12:00:00:

decrease two times

Ques:- Design an elevator system for a 100 story building. Address all issues, like number of elevators, speed of each (Not numerically), waiting times etc. There would be 100-200 people living/working on each floor.
Ques:- REASON FOR CHANGE FROM CURRENT ORGANIZATION?
Ques:- A person with some money spends 1/3 for cloths, 1/5 of the remaining for food and 1/4 of the remaining for travel. He is left with Rs 100/- How much did he have with him in the begining?
Recent Answer : Added by Admin On 2020-05-17 12:00:38:

ans: 250 rs exactly

Ques:- Two pipes function simultaneously the reservoir will be filled in 12 hours. One pipe fills reservoir 10 hours faster than the other. How many hours does the faster pipe take to fill the reservoir?
Recent Answer : Added by Manik rattan On 2021-08-16 06:56:14:

suppose
pipe:
A -30 hours A’s effeciency (60/30) =2
60( lcm of 30 and 20)
B- 20 hours B’s effeciency (60/20)=3

time taken by both to fill = 60/5 =12 as given in question (effeciencies of both a+b =2+3=5)
time taken by faster pipe i.e b = 60/3 =20

Ques:- How would you convince your customer?
Ques:- The cost of four dozen proof machine ribbons and five dozen accouting machine ribbons was Rs.160/-. If one dozen accounting machine ribbons cost Rs.20/-, what is the cost of a dozen proof machine ribbons?
Recent Answer : Added by Admin On 2020-05-17 12:00:20:

15

Ques:- A power unit is there by the bank of the river of 900 mtrwidth. a cable is made from power unit to power a plantopposite to that of the river and 3000 mtr away from thepower unit. The cost of the cable bellows water Rs5 / mtrand cost of cable on the bank is Rs 4/ mtr. Find the totalof laying the cable.
Recent Answer : Added by Ramya s On 2021-03-24 18:26:16:

2100

Ques:- How do you typically organize your work and plan your day?
Ques:- Where do you like to be posted?
Ques:- 8 man work for 6 days to complete a work. How many men are required to complete same work in 1/2 day.
Recent Answer : Added by Srija On 2021-03-31 15:32:39:

8men=6days
Xmen=1/2days
M1=8,D1=6
M2=X,D2=1/2
Formula:
M1*D1=M2*D2
8*6=X*(1/2)
X=8*6*2
X=96
Answer=96

Ques:- In table there r so many rows write a query which two rows r updated last two day befor?
Ques:- it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A works on the job for 2 days and then B works on it until 25 % of the job is left for C to do , and C completes the work ?
Recent Answer : Added by Abhishek Chabri On 2022-10-08 07:25:40:

C will take 4 days and the total number of days taken by a,b and c will be 12 days.

Ques:- Why do you want to work in Night shift?
Ques:- Explain, how would you be an asset to this organization?
Recent Answer : Added by arjun On 2021-12-09 18:39:58:

Dedication ,determination and discipline will be the great asset of company.

Ques:- For the following, find the next term in the series1. 6, 24, 60,120, 210
Recent Answer : Added by LeoOooO On 2022-08-14 16:25:36:

1
6=1x2x3
24=2x3x4
60=3x4x5
120=4x5x6
210=5x6x7
336=6x7x8

Ques:- Describe your Typical Day?
Ques:- Sum of two numbers is 80. Greater number exceeds by 5 from four times of the smaller. Find the numbers?
Recent Answer : Added by Admin On 2022-09-29 18:30:23:

Let x and y be the two numbers. And x > y.
Then,
x + y = 80—–(1)
y=80-y
Also,
x = 4y – 5
Solving the two equations,
80 – y = 4y – 5
85 = 5y
Therefore, y = 17
put the value of y in equation(1)
then
x+y=80
x+17=80
x=63
the numbers are 17&63

Ques:- Whats position of work me job
Ques:- How many regions (open or closed) can n straight lines give at the maximum?

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top