half and hour
A parabola is obtained as the intersection of a cone with a
plane
Hog
Servlets are faster as compared to JSP, as they have a short response time.
JSP is slower than Servlets – JSP is a HTML-based codes.
Servlets are harder to code, as here, the HTML codes are written in Java – JSPs are easier to code, as here Java is coded in HTML.
In an MVC architecture, Servlets act as the controllers. – In MVC architectures, the JSPs act as a view to present the output to the users.
The service() function can be overridden in Servlets. – The service() function cannot be overridden in JSPs.
b)Brother or Sister
Because Bis related to either Brother or Sister.
B
The work done by A in 8 days is = 8/ 12 = 2/3
Means A alone completes 2/3 part of work.
Remaining work which is (1–2/3) = 1/3 is completed by B in 8–2 = 6 days
So the complete work done by B in 6/(1/3) = 18 days.
B alone can complete the work in 18 days.
let convert meter to kilometer by multiply 18/5 then answer be 14*(18/5)=50.4 km/s
Friends,
The Answer given by ‘Gaurav Sharma’ is correct and
the approach (bottom to top) suggested by ‘Shailesh’ is
good. But with minor correction we can arrive the solution
using this approach:
After 5th loot, No. of breads left = 3
after 4th loot, no. of breads left = (3+0.5)x2 = 7
after 3rd loot, no. of breads left = (7+0.5)x2 = 15
after 2nd loot, no. of breads left = (15+0.5)x2 = 31
after 1st loot, no. of breads left = (31+0.5)x2 = 63
So, before 1st loot, no. of breads left = (63+0.5)x2 = 127
FYI
In a cube all the diagonal and sides are equal, we can go diagonally.
This is Expert Verified Answer
22 people found it helpful
author link
Lipimishra2
Expert
568 answers
113.9K people helped
Let the no. of men (originally) be x.
x no. of men require 10 days.
if however there were 10 men less it will take 10 days more for the work to be finished. ——> means x-10 men require 10+10=20 days.
10x = 20 (x-10)
x = 2x -20 => x = 20.
Let the distance between each pole be x m. Then, distance up to 12th pole = 11x m
∴ Speed = 11x22m/s
∴ Time to cover total distance up to 20th pole
= 19x×2411x
= 41.45 s
12.9
2+3+5+7+11+13+17+19+23+29=129
129/10=12.9