The answer probably lies in finding the in-centre of the
traingle. Bisect all the angles of the triangles and the
point where these angle bisectors meet gives u the point P
2, 3, 6, 15, 52.5, 157.5, 630
52.5
Servlets are faster as compared to JSP, as they have a short response time.
JSP is slower than Servlets – JSP is a HTML-based codes.
Servlets are harder to code, as here, the HTML codes are written in Java – JSPs are easier to code, as here Java is coded in HTML.
In an MVC architecture, Servlets act as the controllers. – In MVC architectures, the JSPs act as a view to present the output to the users.
The service() function can be overridden in Servlets. – The service() function cannot be overridden in JSPs.
TEACHER is written as VGCEJGT, how would DULLARD ?
T value is 19
V value is 21 ,
here we get to know that there is difference of 1 letter between them.
Answer: FWNNCTF.
Its very simple..
consider the fraction of s in the mixture = 1/3
So if we add one more R the the fraction wil be = 1/4
Automaticaly S becomes 25% of the mixture
Calculation:
⇒ If 1000 divided by 112, the remainder is 104. ⇒ 112 – 104 = 8 ⇒ If 8 is added to 1000 it will become the smallest four-digit number and a multiple of 112. ⇒ 1000 + 8 = 1008 ∴ The required result will be 1008.
answer : 36 –Explaination:
X= Chickens
Y = Qty per day
X*Y*9= 12 *.9 *Y*30
x=36
we can draw 12 tangents, 4 for 2 circles and 12 for 3
circles
4, 9, 16, 25, 32, 49
Please explain to me why the answer is C. Thank you
((15 X m) + 23)/(m+1)= 16
solving , we get number of matches (m) as 7 (excluding last
match)
so he shud hit 39 runs in last innings to ake average to 18