- Dr. babasaheb ambedkar marathwada university General Aptitude Interview Questions
- Dr. babasaheb ambedkar marathwada university Trainee Interview Questions
- Dr. babasaheb ambedkar marathwada university Personal Questions round Interview Questions
- Dr. babasaheb ambedkar marathwada university HR Interview Questions
- Dr. babasaheb ambedkar marathwada university Lead Interview Questions
3 minutes
one cat kill one rat six minutes
so 1 cat kill 100 rat willbe needed 6*100=600minutes
then 100 rates kill 50minutes means then 600/50=12
so the answer is 12
3 min
previous ans wrong again..!!!!
first find x its 2 hours
total journey 6 hrs 3km up and also down
jill takes one hr to come down and jack takes 3 hrs so x
is 2 hours….
And while going up jack goes at 1.5km/hr and jill goes at
0.75 km hr so to travel 3 km they take 2 hrs and 4 hrs
respectively…!!! x again is 2 hrs…
so jack totally takes 5 hrs to travel 6 km
therfore speed is 6/5 km per hour
thats is 1.2 km per hour is the correct answer
10 minutes
Here is the ans with explanation…..
Just divide 48 hours into 8 parts…
for flowchart its 1/4 so it is 2/8 = 12hours
For Coding it is 3/8 = 18 hours
the rest is again 3/8 = 18 hours for debugging..
– While the train is moving, the jogger will also be running in the same direction.
– for the head(engine) of the train to get to the current position of the jogger 240m away, it will take:
45km/hr => 12.5m/s => 240/12.5 = 19.2 seconds.
– But in the same period of time, the jogger will still be running and will have moved to a new location by: 9km/hr => 2.5m/s => 2.5 * 19.2 = 48m
To get to the new location at the speed of 12.5m/s will take the train:
48/12.5 = 3.84sec
In this additional time, the jogger will move forward by:
3.84 * 2.5 = 9.6m
at a speed of 12.5m/s, it will take the train less than a second to cover the additional 9.6m
If we add the distance the jogger will cover in 1 second to 9.6, it is still less than what the train can cover per second. let us see (9.6 + 2.5 = 12.1)
Therefore, the head of the train will pass the runner at approximately: 19.2 + 3.84 + 1 => 24.04 seconds.
For the train to completely pass the runner, it will need its whole length of 120m to be in front of the runner.
This will take an additional (9.6 + 2) seconds.
Therefore for the length of the train to be ahead of the runner it will take approx. 35.65 (24.04 + 9.6 + 2) seconds
3600 sec in 1 hr.. 1000 M in 1 km so to covert m/s to km /hr you multiply the value with (3000/1000) .. so 3000 divided by 1000 will give you 18/5 it’s like constant value.. to convert m/s to km/ hr we can use this 18/5.. hope you understand
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
1.7% loss
7 1/2