- Digital transformation agency General Aptitude Interview Questions
- Digital transformation agency Trainee Interview Questions
- Digital transformation agency Personal Questions round Interview Questions
- Digital transformation agency HR Interview Questions
- Digital transformation agency Lead Interview Questions
Ques:- Ramesh can finish a work in 20 days and Sushil in 25 days. They both work together for 5 days and then Sushil goes away. In how many days will Ramesh complete the remaining work?
Ques:- Ankaleshwar is famous for:
A. Coal mines
B. Gold mines
C. Iron ore
D. Petroleum
Recent Answer :
: Petroleum
Ques:- Will you able to work on sites?
Ques:- The salary of the Vice-President of India is (a) Rs. 40,000 (b) Rs. 25,000 (c) Rs. 20,000 (d) Rs. 15,000
Ques:- Knowledge of geographical area
Ques:- A train 100 meters long completely crosses a 300 meters long bridge in 45 seconds. What is the speed of the train is?
Recent Answer :
: 32 Km/hr
Ques:- Three different containers contain different quantities of mixture milk and water, whose measurements are 403 Kg, 434 Kg and 465 Kg. What biggest measure must be there to measure all the different quantities exactly?
A. 1 Kg
B. 7 Kg
C. 14 Kg
D. 31 Kg
Recent Answer :
: 31
cos
434-403=31
465-434=31
Ques:- The difference of two numbers is 1365. On dividing the larger number by the smaller, we get 6 as quotient and the 15 as remainder. What is the smaller number?
Recent Answer :
: 270
Ques:- On a nice summer day two tourists visit the Dutch city of Gouda. During their tour through the center they spot a cosy terrace. They decide to have a drink and, as an appetizer, a portion of hot “bitterballs” (bitterballs are a Dutch delicacy, similar to croquettes). The waiter tells them that the bitterballs can be served in portions of 6, 9, or 20. What is the largest number of bitterballs that cannot be ordered in these portions?
Recent Answer :
: 9 its just like popcorn box in cineme everyone take large leaving medium
aside
Ques:- Find the odd man out:
8, 27, 64, 100, 125, 216, 343
8, 27, 64, 100, 125, 216, 343
A. 343
B. 125
C. 100
D. 27
Recent Answer :
: 100
Ques:- A cylinder is 6 cms in diameter and 6 cms in height. If spheres of the same size are made from the material obtained, what is the diameter of each sphere?(a) 5 cms(b) 2 cms(c) 3 cms(d) 4 cms
Recent Answer :
: 2cm b)
Ques:- X and Y together can do a piece of work in 8 days. If X alone can do the same work in 12 days, then Y alone can do the same work in?
Recent Answer :
: 24 days
Ques:- Would you be willing to relocate if required?
Ques:- What irritates you about co-workers?
Ques:- Could you have done better in your last job?
Ques:- In the words of Abraham Lincon what democracy means
Ques:- Why do you switch this company?
Ques:- Why you leave the last company?
Ques:- What do you know about US culture?
Ques:- Who is the chief justice of supreme court?
Ques:- A boy has Rs 2. He wins or loses Re 1 at a time If he wins he gets Re 1 and if he loses the game he loses Re 1. He can loose only 5 times. He is out of the game if he earns Rs 5. Find the number of ways in which this is possible?
Recent Answer :
: Loved by our community
17 people found it helpful
author link
NabasishGogoi
Ace
686 answers
168.2K people helped
0L -> 1 way
1L -> 3 ways
2L -> 7 ways
3L -> 4 ways
4L -> 1 way
total 16 ways
Ques:- What are the differences between Pascal and C.
Recent Answer :
: c-> structured oriented lang
Pascal-> Procedure oriented lang
Ques:- A box contains nine bulbs out of which 4 are defective. If four bulbs are chosen at random, find the probability that all the four bulbs are defective?
Ques:- A leak in the bottom of a tank can empty the full tank in 6 hours. An inlet pipe fills water at the rate of 4 liters per minute. When the tank is full in inlet is opened and due to the leak the tank is empties in 8 hours. The capacity of the tank is?
Ques:- What do you do in your spare time?
Ques:- About personal bio data?
Ques:- Find out the wrong number in the series:
3, 4, 9, 22.5, 67.5, 202.5, 810
3, 4, 9, 22.5, 67.5, 202.5, 810
A. 4
B. 9
C. 67.5
D. 202.5
Recent Answer :
: A. 4
Ques:- How did you know about this vacancy?
Ques:- Why you left your last job?
Ques:- What you lack as a professional.
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.