To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
94
15 litre water contains 20% alcohal ie. 12 (water)+ 3
(alcohol).
after adding 5 liter water it becomes 12+5=17 (water)& 3
(alc.).
ie. 17:3 and answer will be 85:15. ie. 15%.
4, 9, 16, 25, 32, 49
Please explain to me why the answer is C. Thank you
156
10 x 27=270
The Answer is c
10*(root 2)
Assume there are 52 weeks in one year.
Since he supposed to have a new order for every two weeks, he
needs 52/2 = 26 orders to break the office record.
Now after 28 weeks,he has got only 28/2 -6 = 8 orders.
Hence,he needs 26-8 = 18 new orders in the remaining 24= 52-28 weeks to break the office record.
Compute 24 orders/18 weeks = 4/3 orders/week ,
we see that averagely he has a new order for
every 4/3 weeks in the remaining weeks to break the office record.
Since the total train length passed the tunnel so the distance would be the length of train added to the tunnel legth
D=150+300=450 mt.
speed = distance/time
speed = 450/(40.5/3600)
speed =40,000 mt/sec
12%
5! = 120
d / (x+1/2) = 4/5 * t
and d / (x-1/2) = 5/2 + t
solving we get d = 15.
24 days
I WOULD STRIVE TO MAKE THE GOOGLE SEARCH MORE RESPONSIVE
TOWARDS THE QUESTIONS, AS THE GOOGLE RESULT JUST CONTAIN
THE SITE RELATED TO THE TERMS INCLUDED.
this is a simple question but the questionaire needs us to
consume time.
speed of car = 2 * speed of auto.
auto takes 30 mins then car should take only 15 mins.
total time = 10 mins + 15 mins = 25 mins = (a)
12 sec