Ques:- In how many years does a sum of Rs. 5000 yield a simple interest of Rs. 16500 at 15% p.a.?
Ques:- A cistern can be filled by a tap in 4 hours while it can be emptied by another tap in 9 hours. If both the taps are opened simultaneously, then after how much time will the cistern get filled?
Ques:- Tell Me About Your Self & Family Background.
Ques:- Mr. Thomas invested an amount of Rs. 13,900 divided in two different schemes A and B at the simple interest rate of 14% p.a. and 11% p.a. respectively. If the total amount of simple interest earned in 2 years be Rs. 3508, what was the amount invested in scheme B?
Recent Answer :
: In plan A 7500/- and other amounts in plan B
Ques:- About Personal Background
Ques:- What will yo do to acquire new clients?
Ques:- The H.C.F. of two numbers is 8. Which one of the following can never be their L.C.M.?
A. 24
B. 48
C. 56
D. 60
Recent Answer :
: D
Ques:- Speak for five minutes about hyderabad
Ques:- Your fab sub, project work during education?
Ques:- Why do you want to be an HR in initial stage of your career?
Ques:- Which of the following numbers is divisible by 25?
A. 124505
B. 437950
C. 505520
D. 500555
Recent Answer :
: B. 437950
Ques:- Two stations A and B are 110 km apart on a straight line. One train starts from A at 7 a.m. and travels towards B at 20 kmph. Another train starts from B at 8 a.m. and travels towards A at a speed of 25 kmph. At what time will they meet?
Recent Answer :
: 10 a.m.
Ques:- At what rate percent per annum will the simple interest on a sum of money be 2/5 of the amount in 10 years?
Recent Answer :
: 4
Ques:- speak something about ur memorable moment
Ques:- How many times do the hands of a clock coincide in a day?
Recent Answer :
: 11 times in 12hours
Ques:- A work which could be finished in 9 days was finished 3 days earlier after 10 more men joined. The number of men employed was?
Recent Answer :
: No of men employed = N
No of days to finish the work = 9 days
No of men after increase = (N + 10)
No of days to finish the work = 6 days
Equating mandays
9N = (N+10)*6
9N — 6N = 60
3N = 60
N = 20
No of men employed = 20
Ques:- Three numbers are in the ratio 2:3:4 and their product is 1536. what is the Largest number of these numbers?
Recent Answer :
: 16
Ques:- What is the approximate apparel market in India
A. Rs. 30,000 Crores
B. Rs. 20,000 Crores
C. Rs. 15,000Crores
D. Rs. 10,000 Crores
Ques:- A man purchases 8 pens for Rs.9 and sells 9 pens for Rs.8, how much profit or loss does he make?
Recent Answer :
: 2.01
Ques:- What do you mean by sensex and nifty?
Ques:- In order to obtain an income of Rs. 650 from 10% stock at Rs. 96, one must make an investment of?
Ques:- a survey of 100 students at new england college showed the following:7 take english,history and language,17 take english and history,15 take english and language,18 take history and language,48 take english, 49 take history,38 take language.draw a venn diagram and answer the questions how many students
A. take history but neither of the other two?
B. take english and history but not language?
C. take none of the three?
D. take exactly two of the three?
E. do not take a language? (explanation also needed pls)
Ques:- An ant had to travel from one corner of a room to diagonallyopposite corner. It can walk on walls, floor and roof only.How will you find the shortest path for this ant ?
Ques:- Examine the role of money, as a significant motivator, in the present inflationary conditions.
Ques:- A cyclist drove one kilometer, with the wind in his back, in three minutes and drove the same way back, against the wind in four minutes. If we assume that the cyclist always puts constant force on the pedals, how much time would it take him to drive one kilometer without wind?
Recent Answer :
: 3 minutes
Ques:- How many seconds will a train 100 meters long take to cross a bridge 150 meters long if the speed of the train is 36 kmph?
Recent Answer :
: 35 km/h = 10 m/s
Speed = Distance/Time
Distance= (100+150)m = 250m
Speed = 10 m/s
Time= 250/10 = 25s
Ques:- 1.What are your significant functional achievements in the present company? How did they contribute to the total process
Ques:- It was calculated that 75 men could complete a piece of work in 20 days. When work was scheduled to commence, it was found necessary to send 25 men to another project. How much longer will it take to complete the work?
Recent Answer :
: One day work = 1 / 20
One mans one day work = 1 / ( 20 * 75)
Now:
No. Of workers = 50
One day work = 50 * 1 / ( 20 * 75)
The total no. of days required to complete the work = (75 * 20) / 50 =
30
Ques:- Tell me about a time when you overcame a challenge?
Ques:- A rectangular plank (2)1/2 meters wide can be placed so that it is on either side of the diagonal of a square shown below.(Figure is not available)What is the area of the plank?
Given:
Principle Amount(P):₹5000
S.I:₹16500
Rate of Interest(R):15%
Find:T
SI=P*T*R/100
T=SI*100/P*R
T=16500*100/5000*15
T=22 YEARS