Yellow Red Green
Blue Blue Green
Yellow Green Yellow
ans=13.33
solution: (710/12)*8 – 460
Given y/x = 1/3, x+2y =10
3y=x
Then substitute x=3y in x+2y=10
3y+2y=10
5y=10
y=2
Then substitute y=2 in x=3y
x=3*2
x=6
: x=6, y=2
Let three consecutive even numbers be 2n,2n+2,2n+4
product=2n(2n+2)(2n+4)
If n=1,
product =2(4)(6)=48.
So, all the numbers will be divisible by 48 if change n.
TEACHER is written as VGCEJGT, how would DULLARD ?
T value is 19
V value is 21 ,
here we get to know that there is difference of 1 letter between them.
Answer: FWNNCTF.
50
200/3
Servlets are faster as compared to JSP, as they have a short response time.
JSP is slower than Servlets – JSP is a HTML-based codes.
Servlets are harder to code, as here, the HTML codes are written in Java – JSPs are easier to code, as here Java is coded in HTML.
In an MVC architecture, Servlets act as the controllers. – In MVC architectures, the JSPs act as a view to present the output to the users.
The service() function can be overridden in Servlets. – The service() function cannot be overridden in JSPs.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
1.26
A parabola is a conic section.
So cut a cone obliquely.
answer= 4:7