Ques:- Why is that you want to work in some other sector while you graduated in some other field?
Ques:- Tell me a little bit about your background?
Ques:- When was the last occasion that you had to use your negotiating skills to bring about a resolution that was in everyone?s best interest?
Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Ques:- A man took loan from a bank at the rate of 12% p.a. S.I. After 3 years he had to pay Rs. 5400 interest only for the period. The principal amount borrowed by him was?
Recent Answer :
: 3800
Ques:- A can do a piece of work in 12 days. He worked for 15 days and then B completed the remaining work in 10 days. Both of them together will finish it in.
Recent Answer :
: Question is wrong i think
Ques:- Find the smallest number in a GP whose sum is 38 and product 1728?
Ques:- What sort of leader do your people feel you are? Are you satisfied?
Ques:- Corruption is the price we pay for democracy. Discuss
Ques:- What are your career options right now?
Ques:- Give an example of something which you don’t do in a conventional way?
Recent Answer :
: I am not doing my money investment in conventional manner
Ques:- If a red house is made from red bricks, pink house made from pink bricks, a blue house is made from blue brick and a black house is made from black bricks, then what is greenhouse made from?
Recent Answer :
: Green bricks
Ques:- 15 people entered a theater before Sujit. 7 people entered the theater between Sujit and Suraj and 20 people entered the theater after Suraj. If Suraj entered the theater before Sujit then how many people are there in the theater?
Ques:- Are you ready to work as a Fresher or Trainee?
Ques:- 37.5 ? (27)1.5 x 92 = 3?
Recent Answer :
: (3)^ 7.5 ÷ (27)^1.5 x (9)^2 = 3?
⇒(3)^7.5 ÷ {(3)^(3 x 1.5)} x {(3)^(2 x 2)} = 3 ?
⇒ 3^(7.5 – 4.5 + 4) = 3?
⇒ 3^7 = 3?
⇒ ? = 7
Ques:- What location would you prefer?
Ques:- Can you work well under deadline or pressure?
Ques:- You r given a thermometer. What can u do by this without measuring the temperature?
Ques:- Describe a situation where you influenced others to achieve a common goal or objective?
Ques:- A vessel is full of liquid. From the vessel, 1/3rd of the liquid evaporates on the first day. On the second day 3/4th of the remaining liquid evaporates. What fraction of the volume is present at the end of the second day
Recent Answer :
: 1/6
Ques:- If you found 10 million dollars that belongs to nobody, what would you do?
Recent Answer :
: I will try to find that person
Or give that bag to police ..
Ques:- Simplify the 121 * 175 + 363 * 275
Ques:- Please brief us about ur self?
Ques:- Have you worked earlier in construction site?
Ques:- What do you mean by GSM, CDMA?
Ques:- A and B enter into a partnership for a year. A contributes Rs.1500 and B Rs.2000. After 4 months, they admit C, who contributes Rs.2250. If B withdraws his contribution after 9 months, how would they share a profit of Rs.900 at the end of the year?
A. 1 : 1 : 1
B. 1 : 2 : 3
C. 6 : 8 : 9
D. 8 : 6 : 9
Recent Answer :
: A
Ques:- The salary of the Vice-President of India is (a) Rs. 40,000 (b) Rs. 25,000 (c) Rs. 20,000 (d) Rs. 15,000
Ques:- Asking a Post Graduate in CS student whats your typing speed.
Ques:- OUR INTRODACTION DO YOU
Ques:- Can you name three consecutive days without using the words Wednesday, Friday, or Saturday?
Recent Answer :
: Sunday
Monday
Tuesday
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.