Congruent Solutions is a trusted provider of innovative technology solutions, dedicated to helping businesses harness the power of technology to achieve their goals and drive growth. With a focus on collaboration, expertise, and customer satisfaction, Congruent Solutions offers a comprehensive suite of services designed to address the diverse needs of clients across various industries.
At Congruent Solutions, we understand that every business is unique, which is why we take a tailored approach to every project we undertake. Whether it's custom software development, application modernization, cloud migration, or IT consulting, our team of experienced professionals works closely with clients to understand their specific requirements and objectives, ensuring that our solutions are aligned with their goals and deliver tangible results.
One of the key strengths of Congruent Solutions lies in our commitment to excellence and innovation. We continuously invest in research and development to stay at the forefront of technological advancements and industry best practices, enabling us to deliver cutting-edge solutions that drive innovation and transformation for our clients.
let d distance and s be speed.
d/7 = x and d/5 = x+12
solving we get d=210.
2 urns, 9 balls.
4(2)+1=9 and 3(2)+3=9
You can’t put 4 balls in each of 7 urns with balls left over when 7*4=28. 28>24.
Let’s assume the length of each train is ‘L’ and the speeds of the two trains are ‘V₁’ and ‘V₂’ respectively.
When the trains are moving in the opposite direction, their relative speed is the sum of their individual speeds. The total distance they need to cover is the sum of their lengths. Since they cross each other completely in 5 seconds, we can set up the following equation:
(V₁ + V₂) × 5 = 2L
When the trains are moving in the same direction, their relative speed is the difference between their individual speeds. The total distance they need to cover is the difference between their lengths. Since they cross each other completely in 15 seconds, we can set up the following equation:
(V₁ – V₂) × 15 = 2L
Now, let’s solve these equations to find the ratio of their speeds.
From the first equation, we have:
(V₁ + V₂) × 5 = 2L
V₁ + V₂ = (2L) / 5
From the second equation, we have:
(V₁ – V₂) × 15 = 2L
V₁ – V₂ = (2L) / 15
Let’s add these two equations together:
V₁ + V₂ + V₁ – V₂ = (2L) / 5 + (2L) / 15
2V₁ = (6L + 2L) / 15
2V₁ = (8L) / 15
V₁ = (4L) / 15
So, the speed of the first train is (4L) / 15.
Now, let’s substitute this value back into the first equation to find V₂:
(4L) / 15 + V₂ = (2L) / 5
V₂ = (2L) / 5 – (4L) / 15
V₂ = (6L – 4L) / 15
V₂ = (2L) / 15
Therefore, the speed of the second train is (2L) / 15.
The ratio of their speeds is given by:
(V₁ / V₂) = ((4L) / 15) / ((2L) / 15)
(V₁ / V₂) = 4L / 2L
(V₁ / V₂) = 2
So, the ratio of their speeds is 2:1.
Profit ratio will be : 4:5:6
5x=150
X=300
X share is 1200
Y share is 1800
Difference will be = x-y =600
4155
True
24.
exp: 0 is formed by multiplying 5 with 2. so first we find
how many 5’s and 2’s are there in 100!.
No of 5’s : 100/5=20/5=4/5.
20 +4 =24.
No of 2’s : 100/2=50/2=25/2=12/2=6/2=3/2=1/2.
50 +25 +12 +6 +3 +1.
It has 24 5’s and 2’s.
so the no. of zeros=24.
.
2hr 30min