After the mixing, 1lt of the mixture has 0.8lt of milk and 0.2lt of water. 1lt of milk costs Rs.12 so 0.8lt of milk costs 0.8 x 12 = 9.6
He sells the mixture at Rs.15,
so profit%=(15-9.6)/9.6 x 100 = 56.25%
Each PAIR of stations means a PAIR of tickets (A to B and B to A)
2(old stations)(new stations) + 2(new stations)(new stations – 1) = 46
(N * X) + (X * (X – 1)) = 23
factoring ___ X (N + X – 1) = 23
23 is a prime number with only two factors, 1 and 23
so N = 23 and X = 1
Ramu’s Mother-in-law means Ramu’s wife’s mother
Only daughter means Ramu’s wife
And daughter’s son means Ramu’s Son
Answer : Son
answer is 100
[(45 men*8hours)/30 meters]=12 (working rate)
[(x men*5 hours)/50 meters]=12 (working rate is same)
then x=100
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
#1: N = 1, f(N) = 1
#2: N = 199981, f(N) = 199981
#3: N = 199982, f(N) = 199982
#4: N = 199983, f(N) = 199983
#5: N = 199984, f(N) = 199984
#6: N = 199985, f(N) = 199985
#7: N = 199986, f(N) = 199986
#8: N = 199987, f(N) = 199987
#9: N = 199988, f(N) = 199988
#10: N = 199989, f(N) = 199989
#11: N = 199990, f(N) = 199990
#12: N = 200000, f(N) = 200000
#13: N = 200001, f(N) = 200001
#14: N = 1599981, f(N) = 1599981
#15: N = 1599982, f(N) = 1599982
let x be sum.
SI of 18% for 1 year= x*18/100=0.18x;
SI of 18% for 2 years is 0.36x;
SI of 12% for 1 year= x*12/100=0.12x;
SI of 12% for 2 years is 0.24x;
Given, 0.36x-0.24x=840
0.12x=840
x=840/0.12=7000.
we consider a round shape cake.then cut in 2 equal parts in cut into center and next you have to cut its side by center then you have to get 8 equal parts in 3 exact cut
20
150 miles
21
A perfect square is a square number of a digit. eg 64 is a perfect number, a square of 8
Now digits AB9 is a square number of a number.
AB9 Can also be written as A multiply by B multiply by 9
Get the Square root of AB9
Assumption, A=1, B=1
1*1=1=A, 1*1=1=B Therefore,
Square root of A = A, B = B and 9=3
Therefore
An odd number is a number indivisible by 2.
for example 1,3,5,7…….
Therefore Squares A*B*9= AB9
Where a=1, b=1, 3 as digits.
Conclusion
A=1 is an odd number
b